4- cylinder injection engine(1.4 1 direct inction. turbocharger)
Assembly overview - turbocharger
In this manual: 4- cylinder injection engine(1.4 1 direct inction. turbocharger)
~1min read

| 1 - | Turbocharger |
Removing and installing → Chapter
| 2 - | Bolt |
8 N·m
| 3 - | Connection |
| 4 - | O-ring |
Renew
| 5 - | Gasket |
Renew
| 6 - | Heat shield |
| 7 - | Bolt |
25 N·m
| 8 - | Bolt |
8 N·m
| 9 - | Nut |
Renew
14 N·m
| 10 - | Bolt |
Renew
9 N·m
| 11 - | Securing clip |
Renew
| 12 - | Operating lever |
| 13 - | Lock nut |
6 N·m
Secure with sealing paint
| 14 - | Charge air pressure controller -V465- |
Note
Note the following when installing!
There may be different types of charge air pressure controllers installed.
Removing and installing → Chapter

| 1 - | Oil return line |
| 2 - | O-ring |
Renew
| 3 - | Bolt |
9 N·m
| 4 - | O-ring |
Renew
| 5 - | Bolt |
9 N·m
| 6 - | Oil supply line |
| 7 - | O-ring |
Renew
| 8 - | Bolt |
9 N·m
| 9 - | Bolt |
Renew
5 N·m
| 10 - | O-ring |
If damaged, renew crankcase breather hose → Item
| 11 - | Hose |
For crankcase breather
| 12 - | Bolt |
Renew
5 N·m
| 13 - | O-ring |
If damaged, renew crankcase breather hose → Item
| 14 - | Turbocharger |
Removing and installing → Chapter
| 15 - | Gasket |
Renew
| 16 - | Coolant lines |
Supply and return lines
| 17 - | Bolt |
8 N·m
| 18 - | O-ring |
Renew
| 19 - | Bolt |
9 N·m
Test yourself
A quick Volkswagen Golf quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?