Electrical system

Removing and installing fuse holder B -SB-

~1min read

Removing

  • With ignition switched off, disconnect earth cable from battery → Chapter.
  • Press release tabs -arrow- and detach cover -1- for electronics box (engine compartment).
Removing and installing fuse holder B -SB-
  • Release retaining tab -2- using a screwdriver and pull off front cover -1- upwards -arrow-.
Removing and installing fuse holder B -SB-
  • Mark allocation of electrical wiring at threaded connections for reinstallation.
  • Unscrew nuts -1, 2, 4, 5 and 6-.
  • Remove bolt -3-.
  • Move electrical wiring clear -arrow-.
Removing and installing fuse holder B -SB-
  • Cut through cable tie (bottom) on wiring harness.
  • Release fasteners -1, 2 and 4--arrow-, remove fuse holder B -3- and lay to one side.

Installing

Install in the reverse order of removal, observing the following:

  • Fit and secure electrical wiring to fuse holder A according to markings made earlier.
  • Connect battery → Chapter.

Specified torques

→ Chapter „Overview of fitting locations – relay carriers, fuse holders, electronics boxes“
Removing and installing fuse holder B -SB-

Test yourself

A quick Volkswagen Golf quiz: every answer comes with an explanation and a link to the manual page.