General Paint Information
Two-Part Epoxy Primer Filler
In this manual: General Paint Information
~4min read
Definition:Two-Part Epoxy Primer Filler -LLS MAX 220 M1-, beige (250 ml)Two-Part Epoxy Primer Filler -LLS MAX 220 M2-, beige (400 ml)Edition 03/2013Product DescriptionThe Two-Part Epoxy Primer Filler -LLS MAX 220 M1/M2- is a two-component epoxy spray can for use with small damaged areas. Do not use in areas vulnerable to stone impact. The EP primer filler must be protected by the trim panels, body covers, wheel housing liners and UBS material in the underbody area. All difficult to reach areas must be sealed with wax underbody protection.For work safety, wear appropriate, personal protective equipment.Properties:Can be used in a number of waysGood corrosion protectionApplication InstructionsBase SurfaceSuitable base surfaces:Bare sheet steel, sandedCleaned and sanded, galvanized/electrolytically zinced sheet steel or soft aluminumWell-sanded old paint or factory paintOriginal replacement primer, sandedCleaned and sanded UP-GF surfaces, free of separating agentsSurfaces prepared with two-part polyester products and then sanded very fine. |
Pre-treatment of base surfaces:
|
![]() |
|
![]() |
|
![]() |
ProcessingApplication:
|
![]() |
|
![]() |
|
![]() |
|
![]() |
Processing time/pot life:
|
![]() |
Application type “coat”
Spraying distance:
Reaction Temperature:
Note If the spraying procedure is interrupted, make sure that the valve above the spray head is empty to prevent any nozzle blockage. |
![]() |
DryingThe drying time with forced drying is at least 5 to 15 minutes. |
![]() |
| Forced drying at +60 to 65 °C object temperature is 40 to 45 minutes for a layer thickness of 50 to 70 µm. | ![]() |
The drying time for IR drying is a minimum of 10 to 20 minutes. |
![]() |
| IR drying with a 50 to 70 µm layer thickness is 3 to 5 minutes with a short-wave heater at 50% power and then 15 to 20 minutes at 100% power. | ![]() |
Further Processing
|
![]() |
|
![]() |
ReworkingCan be painted over with:Two-part HS top coatsWater-based base paint and two-part HS clear coat Note
Any faults in the base surface can be “filled” with two-part polyester filler.After drying and intermediate sanding, the filled patches can be re-insulated using Two-Part Epoxy Primer Filler -LLS MAX 220 M1/M2-.
Characteristics |
![]() |
| VOC value: 2004/42/IIB(e)(840)650 | The EU limit for this product (product category IIB.b) in ready-to-use form is a maximum of 840 g/L volatile organic compounds. The VOC-value of this product in ready-to-use form is a maximum of 650 g/L. |
StorageThe guaranteed shelf life of 36 months from date of manufacture. Use no later than the date indicated on the label and store in original container at +20 °C. |
![]() |
Test yourself
A quick Volkswagen Polo quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?


Caution The Two-Part Epoxy Primer Filler -LLS MAX 220 M1/M2- may not be applied to PVB (acid-hardening) adhesive primers or one-part primers (for example, synthetic resin).




Note If the spraying procedure is interrupted, make sure that the valve above the spray head is empty to prevent any nozzle blockage.