Engine Lubrication System
Oil Cooler Installation
In this manual: Engine Lubrication System
~1min read
- Replace the O-ring [A] with a new one.
- Apply grease to the new O-ring.

- Install the water hoses and hose clamps [A] as shown in the figure.

- Install the oil cooler [E].
- Apply a non-permanent locking agent to the oil cooler mounting bolts.
- Tighten the oil cooler mounting bolts by following the sequence numbers [1 ∼ 4].
Torque - Oil Cooler Mounting Bolts: 12 NВ·m (1.2 kgfВ·m, 106 inВ·lb)
- Run the water hoses properly (see Cable, Wire, and Hose Routing section in the Appendix chapter).
- Pour: Coolant (see Coolant Change in the Periodic Maintenance chapter) Engine Oil (see Engine Oil Change in the Periodic Maintenance chapter)
- Install the removed parts (see appropriate chapters).
Test yourself
A quick Kawasaki Ninja ZX-10R quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?