Fuel System (DFI)
Throttle Body Assy Assembly
In this manual: Fuel System (DFI)
~1min read
- Before assembling, blow away dirt or dust from the throttle body and delivery pipe assy by applying compressed air.
- Replace the O-rings [A] of the joint pipe [B] with new ones.
- Apply engine oil to the new O-rings, and insert it to the delivery pipes [C].

Insert the joint pipe so that the short side [D] faces right side.
Left and right delivery pipes are identical.

- Replace the O-rings [A] of each primary fuel injector [B] with new ones.
- Apply engine oil to the new O-rings, insert them to the delivery pipe assy [C] and confirm whether the injectors turn smoothly or not.
- Replace the dust seals [A] with new ones.
- Apply engine oil to the new dust seals.
- Install the primary fuel injectors along with the delivery pipe assy to the throttle body.
- Tighten: Torque - Delivery Pipe Assy Mounting Screws: 3.43 NВ·m (0.35 kgfВ·m, 30 inВ·lb)
- Install the throttle body assy (see Throttle Body Assy Installation).

Test yourself
A quick Kawasaki Ninja ZX-10R quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?