Body and Paint

Instrument Panel Cross Member. Removal and Installation

15steps
~90min
4/5difficulty
Done 0 of 15

Special Service Tools / General Equipment

8 mm Drill Bit
MIG/MAG Welding Equipment
Spot Weld Drill Bit
Locking Pliers

Materials

Name Specification
Seam Sealer
TA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-

Removal

NOTICE: Battery electric vehicles (BEV), hybrid electric vehicles (HEV) and plug-in hybrid electric vehicles (PHEV) contain a high-voltage battery. Before cutting or welding near the high-voltage battery, it must be removed to prevent damage.

  1. De-power the SRS.
    Refer to: Supplemental Restraint System (SRS) Disabling and Re-enabling (501-20B).
  2. If necessary:
    Restore the vehicle dimensions to the condition before the damage.
    Refer to: Body and Frame (501-26).
  3. Remove the steering column.
    Also refer to: Steering Column (211-04).
  4. Remove the engine.
    Refer to: Engine (303-01C).
    Refer to: Engine (303-01E).
    Refer to: Engine (303-01I).
    Refer to: Engine (303-01K).
  5. Remove the instrument panel cross member welds and cross member.
    Use common equipment: spot weld drill bit
    Ford Fusion. Dash Panel Crossmember. Removal and Installation

Installation

NOTICE: Battery electric vehicles (BEV), hybrid electric vehicles (HEV) and plug-in hybrid electric vehicles (PHEV) contain a high-voltage battery. Before cutting or welding near the high-voltage battery, it must be removed to prevent damage.

NOTICE: The high-voltage battery in a battery electric vehicle (BEV), hybrid electric vehicle (HEV) or plug-in hybrid electric vehicle (PHEV) can be affected and damaged by excessively high temperatures. Temperatures in the paint booths of some body shops may exceed 60 °C. Therefore, during paint work the paint booth temperature must be set to 60 °C or lower, with a bake time of 45 minutes or less. A temperature above 60 °C or a bake longer than 45 minutes requires removing the high-voltage battery from the vehicle before placing it in the paint booth.

NOTICE: If the paint curing temperature exceeds 60 °C, the charge port indicator ring on plug-in vehicles must be removed.

  1. Drill the plug weld holes in the replacement cross member.
    Use common equipment: 8 mm drill bit.
    Ford Fusion. Dash Panel Crossmember. Removal and Installation
  2. Install, position, clamp and weld the replacement cross member.
    Use common equipment: locking pliers
    Use common equipment: MIG/MAG Welding Equipment
    Ford Fusion. Dash Panel Crossmember. Removal and Installation
  3. Dress all welds as required using standard metal finishing methods.
  4. Seam sealing:
    All seams must be sealed to production level.
    Material: Seam Sealer / TA-2-B, 3M™ 08308, LORD Fusor® 803DTM
    Ford Fusion. Dash Panel Crossmember. Removal and Installation
  5. Install the instrument panel reinforcement and instrument panel bracket.
    Refer to: Instrument Panel Bracket (501-27 Front End Sheet Metal Repairs, Removal and Installation).
    Refer to: Instrument Panel Reinforcement (501-27 Front End Sheet Metal Repairs, Removal and Installation).
  6. Paint the entire repair using a Ford-approved paint system.
  7. If necessary:
    Restore corrosion protection.
    Refer to: Corrosion Prevention (501-25 Body Repairs - General Information, General Procedures).
  8. Install the engine.
    Refer to: Engine (303-01C).
    Refer to: Engine (303-01E).
    Refer to: Engine (303-01I).
    Refer to: Engine (303-01K).
  9. Install the steering column.
    Refer to: Steering Column (211-04).
  10. Re-enable the SRS.
    Refer to: Supplemental Restraint System (SRS) Disabling and Re-enabling (501-20B).

Test yourself

A quick Ford Fusion quiz: every answer comes with an explanation and a link to the manual page.