Vehicle Exterior

Installation

~1min read
INSTALLATION PROCEDURE

1. INSTALL AUTOMATIC LIGHT CONTROL SENSOR

(a) Attach the 2 claws to install the sensor.

(b) Connect the connector.

2. INSTALL NO. 3 HEATER TO REGISTER DUCT


3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT


4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT


5. INSTALL NO. 1 HEATER TO REGISTER DUCT


6. INSTALL NO. 2 HEATER TO REGISTER DUCT


7. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY

(a) Install the instrument panel sub-assembly (See page ).