Vehicle Exterior

Installation

~1min read
010203040505.54N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL TURN SIGNAL FLASHER ASSEMBLY

(a) Install the turn signal flasher assembly with the nut.

Torque:

5,5 N·m {56 kgf·cm, 49 in·lbf}

(b) Connect the connector.

2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY


3. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


4. INSTALL NO. 2 SWITCH HOLE BASE


5. INSTALL COWL SIDE TRIM BOARD LH


6. INSTALL DOOR SCUFF PLATE ASSEMBLY LH

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.