Vehicle Exterior

Reassembly

~1min read
010203040502418N·mlb·ft
Tightening torque found on this page
REASSEMBLY CAUTION / NOTICE / HINT

HINT:

  • Use the same procedure for the RH and LH sides.
  • The procedure listed below is for the LH side.
PROCEDURE

1. INSTALL FLOOR SIDE SILL STAY

(a) Install the floor side sill stay with the 6 bolts.


2. INSTALL SIDE AUTO STEP MOTOR ASSEMBLY

(a) Install the bolt.

Torque:

24 N·m {245 kgf·cm, 18 ft·lbf}

(b) Using a 6 mm hexagon wrench, install the 3 hexagon bolts and side auto step motor assembly.

Torque:

12 N·m {122 kgf·cm, 9 ft·lbf}

(c) Engage the 4 clamps.

3. INSTALL STEP PLATE COVER LH

(a) Install a new step plate cover LH with the 2 screws.

4. INSTALL STEP PLATE COVER RH

HINT:

Use the same procedure as described for the step plate cover LH.

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.