3zr-fae Battery / Charging

Installation

~1min read
0102030405086N·mlb·ft
Tightening torque found on this page

INSTALLATION

PROCEDURE

1. INSTALL GENERATOR ASSEMBLY

(a) Install the wire harness clamp bracket to the generator assembly with the bolt.

Torque:

8 N·m {82 kgf·cm, 71 in·lbf}

(b) Install the generator assembly with the 2 bolts.

Torque:

Bolt A:

25 N·m {255 kgf·cm, 18 ft·lbf}

Bolt B:

43 N·m {438 kgf·cm, 32 ft·lbf}

(c) Engage the clip to connect the engine cable to the wire harness clamp bracket.

(d) Connect the generator connector.

(e) Connect the engine cable with the nut to terminal B.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(f) Install the terminal cap to the generator assembly.

2. INSTALL FAN AND GENERATOR V-BELT

Click here

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Click here

NOTICE:

When the cable has been disconnected, some systems must be reset after the cable is reconnected.

Click here