Installation
INSTALLATION
PROCEDURE
1. INSTALL PARK/NEUTRAL POSITION SWITCH
(a) Temporarily install the park/neutral position switch onto the CVT transaxle assembly using the 2 bolts.
(b) Install the lock plate and lock nut onto the park/neutral position switch. Torque: 6.9 N·m {70 kgf·cm, 61 in·lbf} |
![]() |
(c) Temporarily install the control shaft lever onto the park/neutral position switch.
(d) Turn the control shaft lever clockwise until it stops, then turn it counterclockwise 2 detents. |
![]() |
(e) Remove the control shaft lever from the park/neutral position switch.
(f) Align the projection with the neutral basic line. |
|
(g) Hold the park/neutral position switch in this position and tighten the 2 bolts.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(h) Using a screwdriver, stake the lock nut with the lock plate. |
![]() |
(i) Install the control shaft lever onto the park/neutral position switch using the washer and nut.
Torque:
12.7 N·m {130 kgf·cm, 9 ft·lbf}
(j) Connect the park/neutral position switch connector.
2. CONNECT CONTROL CABLE ASSEMBLY
(a) Connect the shift control cable assembly to the No. 1 shift control cable bracket using a new clip.
(b) Turn the control shaft lever clockwise until it stops, then turn it 2 detents counterclockwise. |
|
(c) Connect the transmission control cable assembly to the control shaft lever with the nut.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
3. CHECK SHIFT LEVER POSITION
Click here![]()
4. ADJUST SHIFT LEVER POSITION
Click here![]()
5. INSPECT PARK/NEUTRAL POSITION SWITCH OPERATION
Click here![]()
6. ADJUST PARK/NEUTRAL POSITION SWITCH
Click here![]()
7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Click here![]()
8. INSTALL AIR CLEANER COVER WITH AIR CLEANER HOSE
Click here
![]()
9. INSTALL AIR CLEANER INLET NO. 1
Click here
![]()
10. INSTALL RADIATOR SHROUD
Click here
![]()
11. INSTALL NO. 2 VALVE COVER
Click here![]()
12. INSTALL LH REAR ENGINE UNDER COVER
Click here
![]()
13. INSTALL NO. 1 ENGINE UNDER COVER
Click here
![]()




