Installation
1. INSTALL THROTTLE BODY
(a) Install a new throttle body gasket to the intake air surge tank.

(b) Install the throttle body with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)


(c) Connect the 2 water by-pass hoses.
(d) Connect the throttle body connector and clamp.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See page EM-59)

3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

(a) Install the air cleaner cap sub-assembly with the 2 bolts.

(b) Connect the the vacuum hose (EVAP) to the air cleaner hose.
(c) Install the No. 2 ventilation hose and air cleaner hose band.
(d) Connect the 3 vacuum hoses.

4. INSTALL NO. 1 AIR CLEANER INLET (See page EM- 59) 5. INSTALL NO. 2 AIR CLEANER INLET (See page EM- 60) 6. ADD ENGINE COOLANT (See page CO-7) 7. INSPECT FOR ENGINE COOLANT LEAK (See page CO-1) 8. INSTALL V-BANK COVER SUB-ASSEMBLY (See page EM-63) 9. INSTALL FRONT OUTER COWL TOP PANEL SUBASSEMBLY (See page EM-61) 10. INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY
HINT: (See page WW-5)
Test yourself
A quick Toyota Sienna quiz: every answer comes with an explanation and a link to the manual page.