3-cyl. injection engine, timing belt drive (4-valve)

Cylinder block, pulley side

47steps
~282min
4/5difficulty
050100150200250150111N·mlb·ft
Tightening torque found on this page
Done 0 of 47

Assembly overview - V-ribbed belt drive

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

  1. Bolt
    • replace after removal
    • 150 N·m +180º
  2. Vibration damper
    • for crankshaft
    • do not tilt during installation
  3. Bolt
    • replace after removal
    • 20 N·m +90º
  4. Cap
  5. Bolt
    • 30 N·m
  6. Tensioning element
  7. Bolt
    • 23 N·m
  8. Alternator
  9. Guide sleeve
  10. A/C compressor
  11. Bolt
    • 23 N·m
  12. V-ribbed belt
    • mark direction of rotation before removal
    • Removing and installing V-ribbed belt "Removing and installing V-ribbed belt"

Assembly overview - Cylinder block, pulley side

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

  1. Bolt
    • Timing belt cover, upper
    • 8 N·m
  2. Timing belt cover, upper
    • Check clips for secure fit
  3. Bolt
    • replace after removal
    • 50 N·m +90º
  4. Camshaft sprocket
    • for exhaust camshaft
    • use counterhold tool -T10172- when removing and installing
  5. Sealing ring
    • Removing and installing "Removing and installing camshaft seal, exhaust camshaft, transmission side"
  6. Timing belt
    • Removing and installing "Removing and installing timing belt"
  7. Sealing plug
    • 20 N·m
  8. Sealing ring
    • Replace if damaged
  9. Bolt
    • replace after removal
    • 50 N·m +90º
  10. Camshaft adjuster
    • for intake camshaft
    • use counterhold tool -T10172- when removing and installing
  11. Guide sleeve
  12. Sealing ring
    • Removing and installing "Removing and installing camshaft seal, exhaust camshaft, transmission side"
  13. Bolt
    • 25 N·m
  14. Tensioner pulley
  15. Idler pulley
  16. Spacer sleeve
  17. Sealing ring
    • Replace if damaged
  18. Bolt
    • 45 N·m
  19. Timing belt sprocket
  20. Sealing ring
    • Removing and installing "Replacing seal ring for crankshaft, pulley side"
  21. Vibration damper
    • for crankshaft
    • do not tilt during installation
    • use counterhold tool -T10475- when removing and installing
  22. Bolt
    • replace after removal
    • 150 N·m +180º
  23. Timing belt cover, lower
  24. Bolt
    • 8 N·m
  25. Bolt
    • replace after removal
    • 40 N·m +90º
  26. Bolt
    • replace after removal
    • 40 N·m +90º
  27. Engine mounting bracket
    • before removal, support engine with support device -10 - 222 A-

Removing and installing V-ribbed belt

Removing and installing V-ribbed belt, vehicles with A/C compressor

Required Special Tools, Test and Measuring Equipment and Auxiliary Items

  • Torque Wrench -V.A.G 1331-

Removing

- Mark direction of rotation of V-ribbed belt with a marker.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Pry off cap of tensioner pulley -arrow- with a screwdriver.

- Loosen mounting bolt -1-.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Turn tensioner pulley in -arrow direction- past the stop using socket bit -2-.

- Remove V-ribbed belt.

Installing


Note

When installing the V-ribbed belt, make sure it sits correctly on the vibration damper and the pulleys.

- Place V-ribbed belt on the vibration damper and the pulleys of the alternator and A/C compressor.

- Slide belt onto tensioner pulley.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Turn tensioner pulley in -arrow direction- past the stop using socket bit -2-.

- Tighten mounting bolt -1- to 30 N·m.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

Routing of V-ribbed belt

  1. Vibration damper/crankshaft
  2. Tensioner pulley
  3. Pulley/alternator
  4. V-ribbed belt
  5. Pulley/A/C compressor
    VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

Removing and installing V-ribbed belt, vehicles without A/C compressor

Required Special Tools, Test and Measuring Equipment and Auxiliary Items

  • V-ribbed belt repair kit with installation tool → Electronic Parts Catalogue (ETKA)

Work sequence


Note

The V-ribbed belt repair kit includes installation tool -T10367/2- and a work instruction.

- Cut V-ribbed belt.

The further procedure is described in the work instruction included with the repair kit.

Routing of V-ribbed belt

  1. Vibration damper/crankshaft
  2. V-ribbed belt
  3. Pulley/alternator
    VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

Replacing crankshaft seal, pulley side

Required Special Tools, Test and Measuring Equipment and Auxiliary Items

  • Installation tool -T10485/1-3-
VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

  • Extraction hook -T20143-

Removing

- Remove timing belt, see "Removing and installing timing belt".

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Pull out seal -1- using extraction hook -T20143/1-.

Installing

- Join installation sleeves -T10485/2- and -T10485/3- together in the direction of the -arrow-.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Slide new seal onto installation sleeve -T10485/2- in the direction of the -arrow-.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Pull off installation sleeve -T10485/3- in the direction of the -arrow-.

- Place installation sleeve -T10485/2- with seal -1- onto crankshaft journal.

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)

- Tighten pressure piece -T10485/1- with vibration damper retaining bolt -2- until it stops.

- Install timing belt, see "Removing and installing timing belt".

  • After completing the work, make sure that locking bolt -T10340- and camshaft locking tool -T10477- have been removed.

Reassembly is carried out in the reverse order of removal.

Tightening torques

VW UP. 3-Zyl. Einspritzmotor, Zahnriemenantrieb (4-Ventiler)