Engine

Water hose removal and installation

8steps
~48min
2/5difficulty
Done 0 of 8
Removal
  1. Remove the side cowlings. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).
  2. Drain engine coolant. Refer to “cooling system inspection” in section 0b .
  3. Lift and support the fuel tank. Refer to “fuel tank removal and installation” in section 1g (page 1g- 9).
  4. Remove the water hose as shown in the water hose routing diagram. Refer to “water hose routing diagram” .
Installation
  1. Install the water hose as shown in the water hose routing diagram. Refer to “water hose routing diagram” .
  2. Install the fuel tank. Refer to “fuel tank removal and installation” in section 1g .
  3. Pour engine coolant and bleed air from the cooling circuit. Refer to “cooling system inspection” in section 0b .
  4. Install the side cowlings. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).

Test yourself

A quick Suzuki GSX-R 1000 quiz: every answer comes with an explanation and a link to the manual page.