Doors / Back Door
Installation
In this manual: Doors / Back Door
~1min read
INSTALLATION
PROCEDURE
1. INSTALL FUEL FILLER DOOR OPENER SWITCH
(a) Engage the claws to install the fuel filler door opener switch, as shown in the illustration.
![]() |
Install in this direction |
2. INSTALL FUSE BLOCK OPENING COVER
Click here
![]()
3. RECONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
![]()
4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
![]()
5. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Click here
![]()
6. INSTALL NO. 1 INSTRUMENT PANEL LOWER COVER SUB-ASSEMBLY
Click here
![]()
7. INSTALL COWL SIDE TRIM BOARD LH
Click here
![]()
8. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
![]()
Was this page helpful?