Doors / Back Door

Installation

~1min read

INSTALLATION

PROCEDURE

1. INSTALL FUEL FILLER DOOR OPENER SWITCH

(a) Engage the claws to install the fuel filler door opener switch, as shown in the illustration.

Install in this direction

2. INSTALL FUSE BLOCK OPENING COVER

Click here

3. RECONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY

Click here

4. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

Click here

5. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY

Click here

6. INSTALL NO. 1 INSTRUMENT PANEL LOWER COVER SUB-ASSEMBLY

Click here

7. INSTALL COWL SIDE TRIM BOARD LH

Click here

8. INSTALL FRONT DOOR SCUFF PLATE LH

Click here