This circuit consists of the air conditioning control and the air conditioning amplifier. When the air conditioning control is operated, signals are transmitted to the air conditioning amplifier through the lin communication system.
If the lin communication system malfunctions, the air conditioning amplifier does not operate even if the air conditioning control is operated.
Wiring diagram Inspection procedure
Check wire harness (air conditioning control assembly - body ground)
Disconnect the air conditioning control assembly connector.
measure the resistance of the wire harness side connector.
Standard resistance
Check wire harness (air conditioning control assembly - battery)
Disconnect the e23 air conditioning control assembly connector.
Measure the voltage of the wire harness side connector.
Standard voltage
Check wire harness (air conditioning amplifier - air conditioning control)
Disconnect the e23 control connector.
Disconnect the e37 amplifier connector.
Measure the resistance of the wire harness side connectors.
Standard resistance
Replace air conditioning amplifier
Replace the air conditioning control with a new or properly functioning one.
Operate the air conditioning control to check that it functions properly.
Replace air conditioning amplifier
?
Test yourself
A quick Toyota RAV4 quiz: every answer comes with an explanation and a link to the manual page.