Air conditioning

Back-up Power Source Circuit

~1min read

DESCRIPTION

This is the back-up power source for the A/C amplifier. Power is supplied even when the ignition switch is off and is used for diagnostic trouble code memory, etc.

WIRING DIAGRAM

Back-up Power Source Circuit

INSPECTION PROCEDURE

1 INSPECT FUSE (ECU-B)

(a) Remove the ECU-B fuse from the engine room junction block.

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance

2 CHECK HARNESS AND CONNECTOR (A/C AMPLIFIER - BATTERY)

CHECK HARNESS AND CONNECTOR (A/C AMPLIFIER - BATTERY)

(a) Disconnect the connector from the A/C amplifier.

(b) Measure the voltage according to the value(s) in the table below.

Standard voltage

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE

Test yourself

A quick Toyota Sienna quiz: every answer comes with an explanation and a link to the manual page.