U660e Automatic Transmission / Transaxle

Installation

~1min read
0102030405054N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

NOTICE:

Before installing the transmission control cable assembly, check that the park/neutral position switch and the shift lever are in neutral.

(a) Pass the control cable from the cabin to the engine compartment.

(b) Install the No. 2 shift cable grommet retainer with the 2 bolts.

Text in Illustration

*1

dash grommet

*2

cable crimp

Torque:

5 N·m {51 kgf·cm, 44 in·lbf}

(c) Connect the transmission control cable to the No. 2 transmission control cable bracket.

(d) Before attaching cable to transmission, make sure to pull cable through dash grommet into engine compartment side until cable crimp is fully seated against dash grommet.

(e) Connect the transmission control cable to the transmission control shaft lever with the nut.

Torque:

13 N·m {130 kgf·cm, 9 ft·lbf}

(f) Connect the transmission control cable to the transmission control cable bracket with a new clip.

2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

(a) Install the front No. 1 floor heat insulator to the body with the 3 nuts.

Torque:

4,9 N·m {50 kgf·cm, 43 in·lbf}

3. INSTALL EXHAUST MANIFOLD TO HEAD GASKET


4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


5. INSTALL MANIFOLD STAY


6. INSTALL FRONT NO. 3 EXHAUST PIPE SUB-ASSEMBLY


7. INSTALL AIR CLEANER CASE


8. INSTALL AIR CLEANER CAP WITH HOSE


9. INSTALL INLET NO. 2 AIR CLEANER


10. INSTALL COOL AIR INTAKE DUCT SEAL


11. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONING UNIT

(See page )


12. INSPECT SHIFT LEVER POSITION


13. ADJUST SHIFT LEVER POSITION


14. INSPECT FOR EXHAUST GAS LEAK

Test yourself

A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.