Door / Hatch

Power Back Door Main Switch

~1min read
Components COMPONENTS ILLUSTRATION
Inspection INSPECTION PROCEDURE

1. INSPECT POWER BACK DOOR MAIN SWITCH


(a) Check that the switch function.

(1) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Switch Condition

Specified Condition

6 (E) - 9 (UL)

Free

Below 1 Ω

6 (E) - 9 (UL)

Pushed

10 kΩ or higher

If the result is not as specified, replace the switch.

(b) Check that the switch illuminates.

(1) Apply battery voltage to the power back door main switch and check that the switch illuminates.

OK:

Measurement Condition

Specified Condition

Battery positive (+) → 8 (ILL+)

Battery negative (-) → 7 (ILL-)

Illuminates

If the result is not as specified, replace the switch.

Removal REMOVAL PROCEDURE

1. REMOVE FRONT DOOR SCUFF PLATE LH


2. REMOVE COWL SIDE TRIM SUB-ASSEMBLY LH


3. REMOVE LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL


4. REMOVE POWER BACK DOOR MAIN SWITCH

(a) Disengage the 2 claws and remove the power back door main switch.

Installation INSTALLATION PROCEDURE

1. INSTALL POWER BACK DOOR MAIN SWITCH

(a) Engage the 2 claws and install the power back door main switch.

2. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL


3. INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH


4. INSTALL FRONT DOOR SCUFF PLATE LH

Test yourself

A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.