Reassembly
1. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY
(a) Install the front blower motor sub-assembly with the 3 screws. |
![]() |
2. INSTALL AIR INLET SERVO MOTOR SUB-ASSEMBLY
(a) Install the air inlet servo motor sub-assembly with the 3 screws. |
![]() |
(b) Engage the 6 claws. |
![]() |
(c) install the blower case with the screw.
3. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
(a) Install the air conditioning amplifier assembly with the 2 screws. |
![]() |
4. INSTALL CLEAN AIR FILTER
(a) Install the clean air filter as shown in the illustration. |
![]() |
5. INSTALL AIR FILTER COVER PLATE
(a) Engage the 2 claws to install the air filter cover plate. |
![]() |
6. INSTALL NO. 1 AIR DUCT SUB-ASSEMBLY
(a) Engage the 4 claws to install the No. 1 air duct sub-assembly. |
![]() |
Test yourself
A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.
.png)
.png)
.png)
.png)

.png)
.png)