5-speed manual transmission 0CF

Unit mounting

10steps
~60min
3/5difficulty
0204060801004030N·mlb·ft
Tightening torque found on this page
Done 0 of 10

Assembly Overview - Engine Mount

Assembly Overview - Engine Mount, up!

VW UP. 5 Gang-Schaltgetriebe 0CF

  1. Engine mount
  2. Bolt
    • Torque strut on subframe
  3. Torque strut
  4. Bolt
    • Torque strut on transmission
  5. Bolt
    • replace after removal
    • Transmission bracket on transmission
    • 40 N·m +90°
  6. Transmission bracket
  7. Transmission mount
  8. Bolt
    • Transmission mount on body
  9. Bolt
    • Transmission mount on body
  10. Bolt
    • replace after removal
    • Transmission bracket on transmission mount
    • 60 N·m +180°

Transmission bracket -A- on transmission

- Replace bolts.

- Tighten all bolts by hand.

- Tighten bolts to specified torque.

VW UP. 5 Gang-Schaltgetriebe 0CF

Transmission to body

- Replace bolt.

- Tighten bolts by hand.

- Tighten bolt to specified torque.

VW UP. 5 Gang-Schaltgetriebe 0CF

Transporting the transmission

Required special tools, testers and equipment, and auxiliary items

  • Transmission lifting fixture -3336-
VW UP. 5 Gang-Schaltgetriebe 0CF

  • Workshop crane -VAS 6100-
VW UP. 5 Gang-Schaltgetriebe 0CF

- Screw transmission lifting fixture -3336- onto the clutch housing.

VW UP. 5 Gang-Schaltgetriebe 0CF

- Adjust support arm on sliding piece with locking pin -arrow-.

Number of visible holes = 5.

- Lift the transmission with workshop crane and transmission lifting fixture -3336-.

- Set the transmission down, e.g. in a transport container.

VW UP. 5 Gang-Schaltgetriebe 0CF