Right Driveshaft Intermediate Bearing
Replacement
PROCEDURE
1. Remove the right driveshaft.
2. Remove the inner CV joint, bearing and bearing housing.
3. Clamp the driveshaft in a vise and press off the dust deflector by striking a drift with a hammer.
4. Pry out and remove the bearing cover from the inboard side.
5. Remove the bearing retaining ring.
6. Press the bearing together with the housing off the driveshaft. If the bearing is to be replaced, it can be carefully driven out by striking a drift with a hammer.
7. Remove the bearing retaining ring from the outboard side.
8. Remove the bearing cover.
9. Press the bearing out of the housing by striking a drift that bears on the outer race.
10. Before assembly, pack the bearing with grease.
11. Press the bearing into the housing so that the cover and retaining ring can be installed.
12. Place a support under the inner race and press the driveshaft into the bearing by striking the end through a wooden spacer, so that the inner retaining ring can be installed.
13. Carefully press on the dust deflectors.
14. Install the CV joint.
15. Install the driveshaft.
Test yourself
A quick Nissan Sunny quiz: every answer comes with an explanation and a link to the manual page.