Exterior Panels / Trim

Installation

~2min read

INSTALLATION

PRECAUTION / NOTICE / HINT

HINT:

  • Repeat the same procedure for the right side and the left side.
  • The following procedure applies to the left side.

PROCEDURE

1. INSTALL QUARTER OUTSIDE MOULDING

HINT:

When installing the quarter outside moulding, heat the vehicle body and the quarter outside moulding using a heat lamp.

CAUTION:

  • Do not touch heated parts or the heat lamp. Touching them may cause burns.

    *a

    Hot Surface

    *b

    Heat Lamp

  • Prolonged contact with heated parts may cause burns.

Standard:

Item

Temperature

Vehicle Body

40 à 60 °C

Quarter outside moulding

20 à 30 °C

NOTICE:

Do not overheat the vehicle body or the quarter outside moulding.

(a) Clean the surface of the vehicle body.

(1) Using a heat light, heat the surface of the vehicle body.

(2) Remove the double-sided tape from the vehicle body.

(3) Remove any adhesive residue using a cleaning agent.

(b) Remove the protective sheet from a new quarter outside moulding.

HINT:

After removing the release liner, prevent the adhesive surface from contacting foreign matter.

(c) Engage the clips and attach the double-sided adhesive tape.

*a

Double-sided adhesive tape

-

-

Install in this direction

-

-

HINT:

Press the quarter outside moulding to install it.

(d) Engage the claws.

(e) Install the 3 screws and clip.

(f) Remove the protective tape.