Installation
INSTALLATION
PROCEDURE
1. INSTALL FLOOR SHIFT LEVER ASSEMBLY
(a) Temporarily install the floor shift lever assembly to the body using 4 bolts.
(b) Fully tighten the 4 bolts in the order shown in the illustration.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
(c) Engage the 6 clips to install the wire harness on the floor shift lever assembly.
(d) Connect the 2 connectors to the floor shift lever assembly.
2. CONNECT CONTROL CABLE ASSEMBLY
(a) Install the transmission control cable assembly on the floor shift lever assembly.
![]() |
Install in this direction |
NOTICE:
Make sure the shift control cable assembly is securely locked.
![]() |
Install in this direction |
(b) Connect the end of the transmission control cable assembly to the floor shift lever assembly.
NOTICE:
- Before connecting the shift control cable assembly, make sure the park/neutral position switch and the shift lever are in the N position.
- Install the end of the shift control cable assembly so that the lock piece faces the driver side.
- Fully install the end of the shift control cable assembly to the base of the pin.
3. INSTALL NO. 1 CONSOLE BOX BRACKET
(a) Install the No. 1 console box bracket to the vehicle body with the 2 bolts.
(b) Engage the 3 clips to install the wire harness on the No. 1 console box bracket.
4. ADJUST SHIFT LEVER POSITION
Click here![]()
5. INSTALL CONSOLE BOX ASSEMBLY
Click here
![]()
6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Click here![]()
7. INSTALL SHIFT LEVER KNOB CAP
(a) Engage the 2 claws to install the shift lever knob cap on the instrument panel garnish.
8. CHECK SHIFT LEVER POSITION
Click here![]()
.png)