Heater / Air Conditioning

Inspection

~1min read

INSPECTION

PROCEDURE

1. INSPECT NO. 1 COOLER THERMISTOR

(a) Check the resistance.

(1) Measure the resistance according to the value(s) shown in the table below.

*a

Component without wire harness connected

(No. 1 Cooler Thermistor)

*b

Sensing Part

*c

Resistance (kΩ)

*d

Temperature (°C (°F))

*e

Allowable Range

-

-

Standard resistance:

Tester Connection

Condition

Specified Condition

1 - 2

-10°C (14°F)

7.30 to 9.10 kΩ

-5°C (23°F)

5.65 to 6.95 kΩ

0 °C

4.40 to 5.35 kΩ

5 °C

3.40 to 4.15 kΩ

10 °C

2.70 to 3.25 kΩ

15 °C

2.14 to 2.58 kΩ

20 °C

1.71 to 2.05 kΩ

25 °C

1.38 to 1.64 kΩ

30 °C

1.11 to 1.32 kΩ

If the resistance is not as specified, replace the No. 1 cooler thermistor.

NOTICE:

  • Hold the sensor by its connector only. Touching the detection area may change the resistance value.
  • When measuring, the temperature sensor must indicate the ambient temperature.

HINT:

Resistance decreases as temperature increases (see graph).

If the specified condition is not met, replace the No. 1 cooler thermistor.