Heater / Air Conditioning

Inspection

~1min read

INSPECTION

PROCEDURE

1. INSPECT QUICK HEATER ASSEMBLY (VALEO make)

(a) Check the resistance.

(1) Measure the resistance according to the value(s) shown in the table below.

Standard resistance:

Tester Connection

Condition

Specified Condition

1 - 2

Always

Below 1 Ω

3 - 2

Always

Below 1 Ω

3 - 4

Always

Below 1 Ω

5 - 4

Always

Below 1 Ω

If the result is not as specified, replace the quick heater assembly.

*a

Component without wire harness connected

(quick heater assembly)