Hybrid Control System

Main Relay (+) / (-) Repair procedures

22steps
~132min
5/5difficulty
Done 0 of 22

Removal

  1. Shut off the High Voltage circuit.

    (Refer to Hybrid Control System - “High Voltage Shutoff Procedure”)

  2. Remove the power relay assembly.

    (Refer to High Voltage Battery System - "Power Relay Assembly (PRA)")

  3. Remove the main relay (A).

    [Main Relay (-)]

    [Main Relay (+)]

Installation

  1. Install the main relay in the reverse order of removal.

Inspection

Checking for Welding in the High Voltage Main Relay

[Using KDS/GDS service data to check for main relay weld damage]

  1. Connect the KDS/GDS to the Data Link Connector (DLC).

  2. Switch "ON" the ignition.

  3. Check for BMS welding damage from KDS/GDS service data.

[Using a Multimeter to measure weld damage]

  1. Shut off the high voltage.

    (Refer to "High Voltage Shut-off Procedures")

  2. Remove the rear seat cushion.

    (Refer to Body - "Rear Seat Assembly")

  3. Remove the rear door scuff trim.

    (Refer to Body - "Door Scuff Trim")

  4. Remove the inlet cooling duct.

    (Refer to High Voltage Battery Cooling System - "Cooling Duct")

  5. Measure the high voltage main relay resistance and check for signs of weld damage.

    Specification : ∞Ω[20 °C]

High voltage main relay (-) switch resistance

[Use multi tester (relay OFF)]

  1. Shut off the high voltage.

    (Refer to "High Voltage Shut-off Procedures")

  2. Remove the side luggage form(LH).

    (Body - "Trunk Trim")

  3. Remove the high battery top cover.

    (High Battery System -"Case")

  4. Measure the resistance between the high voltage power terminal (-) and the inverter power terminal (-).

    Specification : ∞Ω[20 °C]

  5. If the measured resistance is not within the specification, replace the main relay (-) by referring to repair procedures.

[Circuit inspection (Relay ON)

  1. Connect the KDS/GDS to the Data Link Connector (DLC).

  2. Switch "ON" the ignition.

  3. Activate the main relay by using "Actuation Test" on the KDS/GDS as shown in the illustration below.

High Voltage Main Relay Coil Resistance

  1. Shut off the high voltage.

    (Refer to "High Voltage Shut-off Procedures")

  2. Remove the power relay assembly.

    (High Battery System - "Power Relay Assembly")

  3. Check for continuity between the terminals using an ohmmeter.

    Specification : 29.7 - 36.3 Ω [20 °C]