Compressor Repair procedures
Removal
If the compressor is marginally operable, run the engine, and let the air conditioning work for a few minutes, then shut the engine off.
Disconnect the negative (-) battery terminal.
Shut off the high voltage circuit.
(Refer to Heating,Ventilation, Air Conditioning - "High Voltage Shut-off Procedures")
Recover the refrigerant with a recovery/charging station.
Remove the engine room under cover.
(Refer to Engine Mechanical System - "Engine Room Under Cover")
Disconnect the discharge hose (A) and suction hose (B) after loosening the nuts.
Tightening torque : 7.8 - 11,7 N·m


Disconnect the compressor connector (A) and high voltage connector (B).


Remove the compressor assembly (A) after loosening the bolts.
Tightening torque : 20.0 - 33 N·m

Remove the compressor high-voltage connector (A).

Installation
Make sure the compressor mounting bolt with the correct length is screwed in. Tighten the mounting bolts to the specified torque.
Tightening torque : 20.0 - 33 N·m

Install in the reverse order of removal, and note the following.