Maintenance

Installation

~1min read
010203040502015N·mlb·ft
Tightening torque found on this page

INSTALLATION

PROCEDURE

1. INSTALL SPARK PLUG

HINT:

Perform the "Verification after Repair" procedure after replacing a spark plug.

  • with fuel vapor absorber pump module:

    Click here

  • without fuel vapor absorber pump module:

    Click here

(a) Install the 4 spark plugs to the cylinder head sub-assembly.

Torque:

20 N·m {204 kgf·cm, 15 ft·lbf}

NOTICE:

If a spark plug has been dropped or subjected to an impact, replace it.

HINT:

Install the same parts in their original positions.

2. INSTALL IGNITION COIL ASSEMBLY

Click here

3. INSTALL NO. 2 CYLINDER HEAD COVER

Click here

4. PERFORM INITIALIZATION

(a) Perform the "Verification after Repair" after replacing a spark plug or ignition coil assembly.

  • with fuel vapor absorber pump module:

    Click here

  • without fuel vapor absorber pump module:

    Click here