Body Electrical

Installation

~1min read
0204060801004936N·mlb·ft
Tightening torque found on this page

1. INSTALL COMPRESSOR

 INSTALL COMPRESSOR

(a) Install the compressor with 3 bolts.

Torque: 49 N·m

(b) Connect the connector.

2. INSTALL FRONT DRIVE SHAFT LH (SA-33 )

3. CONNECT DISCHARGE AND SUCTION HOSES

CONNECT DISCHARGE AND SUCTION HOSES

(a) Lubricate 2 new O-rings with compressor oil and install them to the hoses.

(b) Connect the both hoses with 2 bolts.

Torque: 10 N·m

NOTICE: Hose should be connected immediately after the caps have been removed.

4. INSTALL AND CHECK DRIVE BELT (AC-17 and AC-15 )

5. CONNECT NEGATIVE (-) TERMINAL CABLE TO BATTERY

6. EVACUATE AIR FROM REFRIGERATION SYSTEM AND CHARGE SYSTEM WITH REFRIGERANT

Specified amount: 1,050 +- 50 g (37.03 +- 1.76 oz.)

7. INSPECT FOR LEAKAGE OF REFRIGERANT

Using a gas leak detector, check for leaks of the refrigerant.

If there is a leakage, check the tightening torque at the joints.

8. INSPECT A/C OPERATION

Test yourself

A quick Toyota Land Cruiser quiz: every answer comes with an explanation and a link to the manual page.