Body Electrical

Disassembly

~1min read
010203040501410N·mlb·ft
Tightening torque found on this page

1. REMOVE A/C AMPLIFIER

REMOVE A/C AMPLIFIER

Remove the 2 screws and the A/C amplifier.

2. REMOVE POWER TRANSISTOR

REMOVE POWER TRANSISTOR

(a) Disconnect the connector.

(b) Remove the 2 screws and the power transistor

3. REMOVE BLOWER CASE

REMOVE BLOWER CASE

(a) Remove the wire harness.

(b) Remove the 11 screws, 3 holding springs and separate the cooling unit cases.

(c) Disconnect the connector.

(d) Remove the blower case.

4. REMOVE BLOWER MOTOR

REMOVE BLOWER MOTOR

Remove the 3 screws and the blower motor.

5. REMOVE EVAPORATOR

REMOVE EVAPORATOR

(a) Disconnect the 2 connector clamps.

(b) Remove the 10 screws and the 2 holding springs, and separate the cooling unit cases.

REMOVE EVAPORATOR

(c) Pull out the thermistor from the evaporator.

REMOVE EVAPORATOR

(d) Remove the screw and the piping clamp.

(e) Loosen the 2 nuts and remove the tube and accessory.

Torque: Liquid line: 14 N·m Suction line: 32 N·m

NOTICE: Cap the open fittings immediately to keep moisture or dirt out of the system.

HINT: At the time of reassembly, lubricate 2 new O-rings with compressor oil and install them in the tubes.

REMOVE EVAPORATOR

(f) Remove the evaporator.

HINT: At the time of reassembly, if evaporator was replaced, add compressor oil to the new evaporator.

Add 40 cc: (1.4 fl.oz.)

Compressor oil: ND-OIL 8 or equivalent

6. REMOVE EXPANSION VALVE

REMOVE EXPANSION VALVE

Using a hexagon wrench (5.0 mm, 0.20 in.), remove the 2 bolts and separate the expansion valve and evaporator.

Torque: 5,4 N·m

HINT: At the time of reassembly, lubricate 4 new O-rings with compressor oil and install them in the tubes.

Test yourself

A quick Toyota Land Cruiser quiz: every answer comes with an explanation and a link to the manual page.