In this manual: Intelligent Variable Transmission (IVT) System
110steps
~660min
4/5difficulty
Tightening torque found on this page
Done 0 of 110
Contents:
Description and Operation
Description
IVT control system relies on various measurements to determine the current control status and determine the necessary compensation values. These values are used to control the actuators and achieve the desired control output. Operation
Adjustment
Adjustment
TCM learning
TCM adaptive values learning : When shift shock has occurred or parts related with the IVT transmission has been replaced, TCM learning should be performed.
In the following case, TCM learning is required.
IVT transmission assembly replacement
TCM upgrade or replacement
TCM adaptive values learning procedure
P range learning (learning condition : IVTF temperature : 30 - 90 °C, shift lever P range, brake off)
Start the engine after checking for the IVT fluid temperature in state of IG ON.
Engine rpm will rise to approximately 1000 rpm after starting the engine.
After 30 seconds to 2 minutes, the learning is completed when the engine rpm reaches the IDLE level. (Learning completion can be confirmed from the "Sensor Data" of KDS )
Do not apply accel pedal and brakes or operate shift levers during P range, learning. (If operated during learning, it needs to be re-engaged after starting off)
Transaxle Control Module (TCM) Description and Operation
Description
The module receives and processes signals from various sensors and implements a wide range of transaxle controls to ensure optimal driving conditions for the driver. Function
Monitors the vehicle's operating conditions to determine the optimal gear setting.
Performs a gear change if the current gear setting differs from the identified optimal gear setting.
Determines the need for torque converter clutch activation and engages the clutch accordingly.
Calculates the optimal line pressure level by constantly monitoring the torque level and adjusts the pressure accordingly.
Diagnoses the faults and failures for IVT.
Operation
Transaxle Control Module (TCM) On Vehicle Inspection
Inspection
TCM ground circuit test : Measure the resistance between TCM and chassis ground. (Inspect the terminal connected to chassis ground with the back of harness connector as the inspection point of TCM side.)
Specification : Below 1Ω
TCM connector test : Disconnect the TCM connector and visually check the ground terminals on TCM side and harness side for bent pins or poor contact pressure.
If problem is not found in Steps 1 and 2, the TCM could be faulty.If so, replace the TCM with a new one, and then check the vehicle again. If the vehicle operates normally then the problem was likely with the TCM.
Reinspection of original TCM : Install the original TCM (probably broken) into a known-good vehicle and check the vehicle. If the problem occurs again, replace the original TCM with a new one. If the problem does not reoccur, this is an intermittent problem and other part may be faulty.
Transaxle Control Module (TCM) Removal and Installation
Removal
The TCM is integrated into the ECM.
Remove the Engine Control Module (ECM). (Refer to Engine Control / Fuel System - "Engine Control Module (ECM)")
Installation
Install the ECM. (Refer to Engine Control / Fuel System - "Engine Control Module (ECM)")
Since TCM and ECM are integrated, perform the procedures related in the ECM after replacing the TCM.
In order to avoid any problem including sense of starting delay of the transmission and shock at acceleration and vehicle start, make sure to process learning for TCM after replacing the TCM. (Refer to IVT Control System - "Adjustment ")
E-Module Specification
Specification
Drive Pulley Speed Sensor
Item
Specification
Type
Hall sensor
Output voltage (V)
High : 1.18 - 1.68 (Nor : 1.4)
Low : 0.59 - 0.84 (Nor : 0.7)
Turbine Speed Sensor
Item
Specification
Type
Hall sensor
Output voltage (V)
High : 1.18 - 1.68 (Nor : 1.4)
Low : 0.59 - 0.84 (Nor : 0.7)
Oil Temperature Sensor
Item
Specification
Type
NTC thermistor
Temperature [°C (°F)] / Resistance (kΩ)
-40 (-40) / 139.5
-20 (-4) / 47.4
0 (32) / 18.6
20 (68) / 8.1
40 (104) / 3.8
60 (140) / 1.98
80 (176) / 1.08
100 (212) / 0.63
120 (248) / 0.38
140 (284) / 0.25
160 (320) / 0.16
E-Module Components and Components Location
Component Location
1. Valve Body Cover 1-a. 9.8 - 11,8 N·m 2. Valve Body Cover Gasket
The sensor detects the rotation speed of the drive pulley in the IVT and transmits it to TCM
Turbine Speed Sensor
Integrated into the E-Module.
Turbine speed sensor detects the speed of the turbine in the IVT and transmits it to TCM.
Oil Temperature Sensor
Integrated into the E-Module.
Oil temperature sensor detects the IVTF temperature and transmits it to TCM.
E-Module Removal and Installation
Removal
Maintain clean condition so that foreign substance does not get into the Intelligent Variable Transmission (IVT).
Use a coated apron, latex gloves, and stainless tray to prevent foreign substance.
Intelligent Variable Transmission (IVT) is composed of delicate components. Be careful not to cause any damage on the component when assembling and disassembling.
Remove the valve body assembly. (Refer to Hydraulic System - "Valve body")
Disconnect the pressure sensor connector (A).
Remove the E-Module (A) after removing the bolts.
Tightening torque : 9.8 - 11,8 N·m
Installation
Install in reverse order of removal.
Driven Pulley Pressure Sensor Specification
Specification
Item
Specification
Pressure (Mpa)
0 - 6
Operating temperature [°C (°F)]
-40 to 140 (-40 to 284)
Output voltage (V)
5
Driven Pulley Pressure Sensor Components and Components Location
Component Location
1. Valve Body Cover 1-a. 9.8 - 11,8 N·m 2. Valve Body Cover Gasket
Driven Pulley Pressure Sensor Description and Operation
Description
Driven pulley pressure sensor measures the pressure applied to the driven pulley and transmits it to TCM.
Driven Pulley Pressure Sensor Removal
Removal
Maintain clean condition so that foreign substance does not get into the Intelligent Variable Transmission (IVT).
Use a coated apron, latex gloves, and stainless tray to prevent foreign substance.
Intelligent Variable Transmission (IVT) is composed of delicate components. Be careful not to cause any damage on the component when assembling and disassembling.
Remove the engine room under cover. (Refer to Engine Mechanical System - "Engine Room Under Cover")
Remove the IVTF drain plug (A), allow the fluid to drain out and then reinstall the drain plug.
Tightening torque : 34.3 - 39 N·m
Intelligent variable transmission fluid (IVTF) can be reused. Collect it using a clean 10-liter beaker.
The existing IVTF drain plug gasket must be replaced with a new one (do not reuse).
Remove the valve body cover (A) after removing the bolts.
Be careful when removing the valve body cover because the remaining IVTF remains in the valve body cover.
Remove the valve body cover gasket (A).
Remove the IVTF filter (A) after removing the bolts.
Disconnect the driven pulley pressure sensor connector (A).
Remove the driven pulley pressure sensor (A).
Driven Pulley Pressure Sensor Installation
Installation
Maintain clean condition so that foreign substance does not get into the Intelligent Variable Transmission (IVT).
Use a coated apron, latex gloves, and stainless tray to prevent foreign substance.
Intelligent Variable Transmission (IVT) is composed of delicate components. Be careful not to cause any damage on the component when assembling and disassembling.
Install the driven pulley pressure sensor (A).
Tightening torque : 11.8 - 13,7 N·m
Connect the driven pulley pressure sensor connector (A).
Install the IVTF filter (A).
Tightening torque : 9.8 - 11,8 N·m
Install the valve body cover in the following order.
Remove foreign substances from the surface of the IVT case and valve body cover.
Install the valve body cover (A) and gasket (B), and temporarily tighten the bolts except reference hole (C).
The existing valve body cover gasket must be replaced with a new one (do not reuse).
Tighten the bolts by hand to adjust the position of the gasket.
Visually check the reference hole (A) to align the valve body cover hole with the gasket hole.
Tightening the bolts without aligning the valve body hole with the gasket hole may result in any IVTF leaks.
Tighten the remaining valve body cover mounting bolts except for the reference hole to the tightening torque.
Tightening torque : 9.8 - 11,8 N·m
Tighten the bolts diagonally alternately so that pressure is evenly applied.
Check that the valve body cover hole and gasket hole are properly aligned through the reference hole and tighten the bolt (A) to the reference hole.
Tightening torque : 9.8 - 11,8 N·m
Check the valve body cover for damage (crack, deformation, etc.) and clean the IVTF around the mounting area.
Check the IVTF level after refilling the intelligent variable transmission with fluid. (Refer to Hydraulic System - "Fluid")
Check for leakage of IVT fluid from engine start.
Install the engine room under cover. (Refer to Engine Mechanical System - "Engine Room Under Cover")
Perform the pressure sensor characteristics input using the KDS. (When replacing the pressure sensor) (S/W Management → Intelligent Variable Transmission → Pressure Sensor Characteristics Input)
Input '76' in the characteristic value input field.
Refer to the KDS screen for operating conditions and details.
Driven Pulley Speed Sensor Specification
Specification
Item
Specification
Type
Hall sensor
Supply voltage (V)
9
Output signal (mA)
High : 11.8 - 16.8
Low : 5.9 - 8.4
Driven Pulley Speed Sensor Components and Components Location
Component Location
1. Driven Pulley Speed Sensor
1-a. 9.8 - 11,8 N·m
Driven Pulley Speed Sensor Description and Operation
Description
The sensor detects the rotation speed of the driven pulley and transmits it to TCM.
Driven Pulley Speed Sensor On Vehicle Inspection
On Vehicle Inspection
Check the sensor waveform with KDS.
Driven Pulley Speed Sensor Removal and Installation
Removal
Remove the air cleaner assembly. (Refer to Engine Mechanical System - "Air Cleaner")
Remove the battery and battery tray. (Refer to Engine Electrical System - "Battery")
Disconnect the driven pulley speed sensor connector (A).
Remove the driven pulley speed sensor connector (A) from the bracket.
Remove the driven pulley speed sensor (A) after removing the bolt.
Tightening torque : 9.8 - 11,8 N·m
Installation
Install in the reverse order of removal.
Position Switch Specification
Specification
Item
Specification
Power supply (V)
4.5 - 5.5
Output type
Shifting range (P/R/N/D)
Non-contact (2 channel PWM signal)
Start, Reverse
Contact
Position Switch Components and Components Location
Component
1. Manual Control Lever 1-a. 17.7 - 24 N·m
2. Position Switch 2-a. 9.8 - 11,8 N·m
Position Switch Troubleshooting
Troubleshooting
Position Switch On Vehicle Inspection
On Vehicle Inspection
The Intelligent Variable Transmission system can be more quickly diagnosed for problems by using the vehicle diagnostic system (KDS). (Refer to "DTC guide")
Self diagnosis : Inspection and display fault code (DTC)
Sensor data : Checking the system input/output data state
Forced operation : Check the system operating condition
Additional function : Controlling other features including system option setting and zero point adjustment
Component Inspection
Inspect the following items by referring to inspection flow chart. (Refer to Position Switch - "Troubleshooting")
Check the diagnostic trouble codes (DTC) using KDS.
Check that "N" range setting matches. (Refer to Position Switch - "Installation")
Check the free play for shift cable. (Refer to Shift Cable - "Installation")
Check the condition of connector.
Inspect connector thoroughly for looseness, poor connection, bending, corrosion, contamination, deformation, or damage.
Measure the voltage between the power supplied to the position switch circuit and the ground.
Specification : 12 V
Inspect the ground of rear combination lamp circuit.
Inspect the wiring connection of junction box power terminal and fuse.
Check for separation of fuse holder and check that the holder is tightly holding the fuse.
Attach tester fuse to check that it is connected properly.
Check if fuse is damaged.
Check the position switch circuit signal.
Turn ignition "ON", and engine "OFF".
Measure the PWM output at each range (P, R, N, D).
Specification : Refer to table below
Signal (Pin)
PWM output value (%)
P
R
N
D
S1 (7)
10.0 - 30.7
37.6 - 56.9
59.1 - 74.3
76.5 - 90.0
S2 (8)
69.3 - 90.0
43.1 - 62.4
25.7 - 40.9
10.0 - 23.5
Position Switch Removal
Removal
Place the shift lever in the 'N' position.
Use wheel chocks to prevent vehicle from moving accidentally.
Disconnect the battery negative ( - ) terminal.
Remove the air cleaner assembly. (Refer to Engine Mechanical System - "Air Cleaner")
Disconnect the position switch connector (A).
Remove the shift cable by removing the nut (A).
Remove the manual control lever (A) and the washer after removing the nut.
Remove the position switch (A) after removing the bolts.
Position Switch Installation
Special Service Tool
Tool Name / Number
Illustration
Description
Position switch guide pin 09480 - A3800
Used for fixing N range when installing position switch
Installation
Check that the shift lever is placed in the N range.
Install the position switch (A).
Lightly tighten the mounting bolts so that necessary adjustments can be made.
Install the manual control lever (A).
Lightly tighten the mounting nut so that necessary adjustments can be made.
Align the hole in the manual control lever with the "N" position hole of the position switch and then insert the SST (09480 - A3800).
Tighten the manual control lever nut (A) with the specified torque.
Tightening torque : 17.7 - 24 N·m
Tighten the position switch bolts (A) with the specified torque.
Tightening torque : 9.8 - 11,8 N·m
Tighten the nut (A) with the specified torque after removing free play by pushing the shift cable in the direction of the arrow.
Tightening torque : 9.8 - 13,7 N·m
Remove the SST (09480 - A3800).
Connect the position switch connector (A).
Install the air cleaner assembly. (Refer to Engine Mechanical System - "Air Cleaner")
Parking Sprag Removal and Installation
Removal
Place the shift lever in the 'N' position.
Remove the IVTF drain plug, allow the fluid to drain out and then reinstall the drain plug. (Refer to Hydraulic System - "Fluid")
Remove the Intelligent Variable Transmission (IVT). (Refer to Intelligent Variable Transmission (IVT) - "Removal")
Remove the sound absorption cover (A, B, C).
Tightening torque : 9.8 - 11,8 N·m
Remove the rear housing (A).
Tightening torque : 19.6 - 26 N·m
Remove the parking sprag (A).
Tightening torque : 24.5 - 29 N·m
Use a scraper to remove the remaining sealant (A) on the rear housing of the IVT.
Installation
Install in the reverse order of removal.
Before mounting, replace the parking rod cam if there are excessive flaws on the outside of the parking rod cam (A).
Make sure that there is an O-rings (A) on the side of the case.
Apply sealant on the IVT case side (A). Standard sealant : LOCTITE FMD-5460/5480, THREE-BOND TB1281B/1216C Bead diameter : 1.5 - 1.7 mm
Check the IVTF level after refilling the IVT with fluid. (Refer to Transmission Gear Oil - "Replacement")
Parking Rod Cam Removal and Installation
Removal
Place the shift lever in the 'N' position.
Remove the IVTF drain plug, allow the fluid to drain out and then reinstall the drain plug. (Refer to Hydraulic System - "Fluid")
Remove the Intelligent Variable Transmission (IVT). (Refer to Intelligent Variable Transmission (IVT) - "Removal")
Remove the torque convertor (A) from convertor housing.
Remove the air breather pipe (A).
Tightening torque : 9.8 - 11,8 N·m
Remove the manual control lever (A) and the washer after removing the nut.
Tightening torque : 17.7 - 24 N·m
Remove the position switch (A) after removing the bolts.
Tightening torque : 9.8 - 11,8 N·m
Remove the sound absorption cover (A).
Tightening torque : 9.8 - 11,8 N·m
Remove the torque convertor housing (A).
Tightening torque : 27.5 - 34 N·m
Remove the bolts (A).
Tightening torque : 9.8 - 11,8 N·m
Remove the manual control shaft (A).
Remove the detent spring assembly (A).
Tightening torque : 19.6 - 26 N·m
Remove the parking rod assembly (A).
Remove the parking rod cam (A).
Use a scraper to remove the remaining sealant (A) on the housing of the IVT.
Installation
Install in the reverse order of removal.
Apply sealant on the IVT case side (A). Standard sealant : LOCTITE FMD-5460/5480, THREE-BOND TB1281B/1216C Bead diameter : 1.5 - 1.7 mm
Check the IVTF level after refilling the IVT with fluid. (Refer to Transmission Gear Oil - "Replacement")
Shift Lever Components and Components Location
Component
1. Snap Pin 2. Shift Cable
3. Shift Lever 3-a. 8.8 - 13,7 N·m
Shift Lever Removal and Installation
Removal
Place the shift lever in the 'N' position.
Use wheel chocks to prevent vehicle from moving accidentally.
Disconnect the battery negative ( - ) terminal.
Remove the floor console assembly. (Refer to Body - “Floor Console Assembly”)
Disconnect the connector (A).
Remove the wiring clip (A).
Remove the snap pin (A).
Remove the shift cable (A) from the shift lever.
Remove the shift lever assembly (A) after removing the bolts.
Tightening torque : 8.8 - 13,7 N·m
Installation
Install in reverse order of removal.
Insert "N" range fixing pin (A) after checking shift lever and the manual control lever are in the "N" range before installation.
Install the shift cable after checking the direction of tab (A) to prevent incorrect assembly.
Mind the installation direction of snap pin and install the snap pin with the hook facing upward.
Make sure to get rid of "N" range fixing pin (A) after installing the shift lever assembly.
Shift Cable Components and Components Location
Component
1. Snap Pin 2. Shift Cable
2-a. 9.8 - 13,7 N·m 2-b. 11.8 - 14,7 N·m
Shift Cable Removal
Removal
Place the shift lever in the 'N' position.
Use wheel chocks to prevent vehicle from moving accidentally.
Remove the air cleaner assembly. (Refer to Engine Mechanical System - "Air Cleaner")
Remove the battery and battery tray. (Refer to Engine Electrical System - "Battery")
Remove the shift cable by removing the nut (A).
Remove the shift cable (A) from the bracket (B).
Remove the console upper cover. (Refer to Body - "Floor Console Assembly")
Remove the snap pin (A).
Remove the shift cable (A) from the shift lever.
Remove the floor console side cover (A).
Clip position :
Remove the shift cable retainer (A) after removing the nuts. Then, remove the shift cable by pulling it toward the vehicle interior.
Shift Cable Installation
Special Service Tool
Tool Name / Number
Illustration
Description
Position switch guide pin 09480 - A3800
Used for fixing N range when installing position switch
Installation
Checking shift lever and the manual control lever are in the N range before installation.
Install the shift cable retainer (A).
Tightening torque : 11.8 - 14,7 N·m
Install the shift cable (A) to the shift lever.
Install the shift cable after checking the direction of tab (A) to prevent incorrect assembly.
Insert the snap pin (A).
Mind the installation direction of snap pin and install the snap pin with the hook facing upward.
Install the shift cable (A) to the bracket (B).
The existing shift cable clip must be replaced with new one (do not reuse).
Align the hole in the manual control lever with the N position hole of the position switch and then insert the SST (09480 - A3800).
Tighten the nut (A) to the specified torque after removing free play by pushing the shift cable in the direction of the arrow.
Tightening torque : 9.8 - 13,7 N·m
Remove the SST (09480 - A3800).
Install the console upper cover. (Refer to Body - "Console Upper Cover")
Install the battery and battery tray. (Refer to Engine Electrical System - "Battery")
Install the air cleaner assembly. (Refer to Engine Mechanical System - "Air Cleaner")
Check that operating surely at each range of the inhibitor switch corresponding to each position of shift lever.