Transmission & Driveline

Additional Service When Replacing Control Valve & Tcm

6steps
~36min
4/5difficulty
Done 0 of 6

Description

When replacing the control valve & TCM, perform the following work. For work procedure, refer to Work Procedure.

  • A/T fluid filling

  • Calibration of park position sensor

  • vehicle specifications writing

  • A/T fluid level adjustment

  • Torque converter clutch point learning

  • Calibration of decel G sensor

Work Procedure

REPLACE CONTROL VALVE & TCM

Replace control valve & TCM. Refer to Removal and Installation.

>>

GO TO 2.

REFILL A/T FLUID

Refill A/T fluid. Refer to Changing.

>>

GO TO 3.

CALIBRATE PARK POSITION SENSOR AND WRITING vehicle SPECIFICATIONS

With CONSULT

  1. Ignition switch ON.

  2. Select "TRANSMISSION".

  3. Select "Replace ECU".

  4. Perform the work according to the procedure displayed in CONSULT.

  • Turn the ignition switch OFF and wait until the combination meter turns off. Then turn the ignition switch ON.

  • Disconnect the 12V battery terminal and reconnect it. Then turn the ignition switch ON. Refer to Precautions for Removing Battery Terminal.

>>

GO TO 4.

ADJUST A/T FLUID LEVEL

Adjust A/T fluid level. Refer to Adjustment.

>>

GO TO 5.

PERFORM TORQUE CONVERTER CLUTCH POINT LEARNING

Perform torque converter clutch point learning. Refer to Descripton.

>>

GO TO 6.

CALIBRATE DECEL G SENSOR

  1. Perform decel G sensor calibration. Refer to Description.

  2. Clear any DTCs that may have set and then test drive the vehicle.

>>

WORK END