Engine Starting System

Alternator

~1min read

Removal

PROCEDURE

1. Disconnect the battery ground cable.

2. Remove the drive belt from the generator pulley.

3. Disconnect the wiring.

4. Remove the upper and lower bolts and remove the generator.

Installation

PROCEDURE

1. Install in the reverse order.

2. Adjust the drive belt tension and check the tightness of the mounting bolts.

Inspection and replacement of brushes and voltage regulator. To be performed at a service station.

Test yourself

A quick Nissan Sunny quiz: every answer comes with an explanation and a link to the manual page.