When the ignition switch is turned on, the battery voltage is applied to the igsw of the ecm. The output signal from the mrel terminal of the ecm causes a current to flow to the coil, closing the contacts of the integration relay (efi main relay) and supplying power to either terminal +b or +b2 of the ecm.
Wiring diagram Inspection procedure
Inspect fuses (p/i, am2, ig2, efi main, ign)
Remove the p/i fuse, am2 fuse, ig2 fuse and efi main fuse from the engine room no. 1 Relay block.
Remove the ign fuse from the instrument panel junction block.
Measure the resistance of the fuses.
Standard resistance: below 1
Reinstall the fuses.
Inspect relay (ig2, efi main)
Remove the integration relay and ig2 relay from the engine room no. 1 Relay block.
Measure the resistance between the terminal of the integration relay.
Standard resistance
Measure the resistance between the terminal of the ig2 relay.
Standard resistance
Reinstall the relay.
Check harness and connector (ecm - body ground)
Disconnect the b30 ecm connector.
Measure the resistance.
Standard resistance
Reconnect the ecm connector.
Inspect ecm (igsw voltage)
Disconnect the b30 and a9 ecm connectors.
Turn the ignition switch on.
Measure the voltage between the terminals of the b30 and a9 ecm connectors.