Engine

Throttle body disassembly and assembly

2steps
~12min
1/5difficulty
010203040503.53N·mlb·ft
Tightening torque found on this page
Done 0 of 2

Refer to “throttle body removal and installation” .

Disassembly Caution identify the position of each removed part.

Organize the parts in their respective groups so that they can be reinstalled in their original positions.

  1. Disconnect the fuel feed hose (1), isc valve hose (2) and vacuum hoses (3).
  2. Disconnect the purge hose (4). (E-33 only)
    Suzuki GSX-R. Disassembly

  1. Remove the fuel delivery pipe assembly (5).
Caution

be careful not to twist the fuel delivery pipes and t-joint (6) when removing them, or joint part “a” of the fuel delivery pipe get damage.

Suzuki GSX-R. Disassembly

  1. Remove the primary fuel injectors (7) and secondary fuel injectors (8) from the fuel delivery pipes.
Suzuki GSX-R. Disassembly

  1. Remove the fuel pipe (9) from the primary fuel injectors (7).
Suzuki GSX-R. Disassembly

  1. Remove the t-joint (6) from the fuel delivery pipes.
Suzuki GSX-R. Disassembly

  1. Remove the isc valve hoses (10) and isc valve (11).
Suzuki GSX-R. Disassembly

  1. Remove the tp sensor (12) and stp sensor (13) with the special tool.
Special tool : 09930–11950 (torx wrench (5 mm))
Note

prior to disassembly, mark each sensor’s original position with a paint or scribe for accurate reinstallation.

Suzuki GSX-R. Disassembly

Caution never remove the stva (14) from the throttle body.

Suzuki GSX-R. Disassembly

Caution

never remove the throttle valves (15) and secondary throttle valves (16).

Suzuki GSX-R. Disassembly

Caution

  • these adjusting screws (17), (18) and (19) are factory-adjusted at the time of delivery and do not turn or remove them.
  • Do not separate the throttle body.

Suzuki GSX-R. Disassembly

Assembly

Reassemble the throttle body in the reverse order of disassembly. Pay attention to the following points:

  • with the secondary throttle valves fully opened, install the stp sensor (black) and tighten the stp sensor mounting screw to the specified torque.
Note

  • apply thin coat of engine oil to the o-ring.
  • Align the secondary throttle valve shaft end “a” with the groove “b” of the stp sensor.
  • Apply grease to the secondary throttle valve shaft end “a” if necessary.

: Grease 99000–25010 (suzuki
super grease “a” or equivalent)
Special tool : 09930–11950 (torx wrench (5 mm))
Tightening torque stp sensor mounting screw: 3,5 N·m
Suzuki GSX-R. Assembly

Note

  • make sure the secondary throttle valves smoothly open and close.
  • If necessary, adjust the stp sensor. Refer to “stp sensor adjustment” in section 1c .

Suzuki GSX-R. Assembly

  • With the throttle valves fully closed, install the tp sensor (gray) and tighten the tp sensor mounting screw to the specified torque.
Caution

  • apply thin coat of engine oil to the o-ring.
  • Align the throttle valve shaft end “c” with the groove “d” of the tp sensor.
  • Apply grease to the throttle valve shaft end “c” if necessary.

: Grease 99000–25010 (suzuki
super grease “a” or equivalent)
Special tool : 09930–11950 (torx wrench (5 mm))
Tightening torque tp sensor mounting screw: 3,5 N·m
Suzuki GSX-R. Assembly

Note

  • make sure the throttle valves smoothly open and close.
  • If necessary, adjust the tp sensor. Refer to “tp sensor adjustment” in section 1c .

Suzuki GSX-R. Assembly

  • Apply a thin coat of engine oil to the o-ring, install the isc valve to the throttle body and tighten the isc valve mounting screw to the specified torque.
Special tool : 09930–11960 (torx wrench (4 mm))
Tightening torque isc valve mounting screw (a): 2 N·m
Suzuki GSX-R. Assembly

  • Apply thin coat of engine oil to the new o-rings (1) and cushion seals (2).

Caution replace the o-rings and cushion seals with new ones.

Suzuki GSX-R. Assembly

Suzuki GSX-R. Assembly

  • Assemble the fuel delivery pipes so the t-joint is set in proper angle as shown in the figure.
Caution

be careful not to twist the fuel delivery pipes and t-joint when installing them, or joint part “e” of the fuel delivery pipe may get damage.

Suzuki GSX-R. Assembly

  • Install each fuel injector by pushing it straight to the delivery pipe.

Caution never turn the injector while pushing it.

Note align the coupler “f” of injector with boss “g” of the delivery pipe.

Suzuki GSX-R. Assembly

  • Install the fuel delivery pipe assembly to the throttle body.
  • Tighten the fuel delivery pipe mounting screws to the specified torque.
Tightening torque fuel delivery pipe mounting screw (b): 3,5 N·m
Suzuki GSX-R. Assembly

Connect the hoses properly. Refer to “throttle body construction” .

Test yourself

A quick Suzuki GSX-R 1000 quiz: every answer comes with an explanation and a link to the manual page.