Heater / Air Conditioning

PTC Heater Circuit

~6min read

DESCRIPTION

The air conditioning amplifier assembly sends operating signals to the PTC heater relays when the quick heater assembly operating conditions are met. Based on the signals from the air conditioning amplifier assembly, the PTC heater relays are turned ON and power is supplied to the quick heater assembly installed on the air conditioning radiator assembly.

Quick Heater Assembly Operating Conditions

Control ECU

Condition

Air Conditioning Amplifier Assembly

Engine is running

ECO mode: OFF

Blower switch: ON

Temperature setting: MAX HOT

Illumination control switch in OFF position

  • Engine coolant temperature at 65 °C or below (3 PTC heater relays operating)
  • Engine coolant temperature at 70 °C or below (2 PTC heater relays operating)
  • Engine coolant temperature at 75 °C or below (1 PTC heater relay operating)
  • Ambient temperature at -7°C (19°F) or below (3 PTC heater relays operating)
  • Ambient temperature at 16 °C or below (2 PTC heater relays operating)
  • Ambient temperature at 25 °C or below (1 PTC heater relay operating)

WIRING DIAGRAM

PRECAUTION / NOTICE / HINT

NOTICE:

Check the fuses for the circuits related to this system before performing the following procedure.

PROCEDURE

  1. PERFORM ACTIVE TEST USING TECHSTREAM

(a) Connect the Techstream to the DLC3.

(b) Turn the ignition switch to ON.

(c) Turn on the Techstream.

(d) Select the following menu items: Body Electrical / Air Conditioner / Active Test.

(e) Perform the Active Test by following the Techstream instructions.

Body Electrical > Air Conditioner > Active Test

Tester display

Item

Control Range

Diagnostic Note

Heater Active Level

Quick heating assembly

Min.: 0, Max.: 3

-

Body Electrical > Air Conditioner > Active Test

Heater Active Level

OK:

The active heating level normally changes.

NG

GO TO APPLICABLE SYSTEM AS INDICATED IN THE PROBLEM SYMPTOMS TABLE

OK
  1. INSPECT PTC HEATER RELAY

(a) Remove the PTC heater relays.

(b) Inspect the PTC heater relays.

Click here

NG

REPLACE PTC HEATER RELAY

OK
  1. INSPECT WIRE HARNESS AND CONNECTOR (PTC HEATER RELAY - POWER SOURCE)

(a) Measure the voltage according to the value(s) shown in the table below.

Standard voltage:

PTC HTR No. 1

Tester Connection

Ignition switch position

Specified Condition

Relay terminal 3 - Body ground

Ignition Switch in OFF position

11 à 14 V

Relay terminal 1 - Body ground

Ignition Switch in OFF position

Below 1 V

Relay terminal 1 - Body ground

Ignition switch ON (IG)

11 à 14 V

Standard voltage:

PTC HTR No. 2

Tester Connection

Ignition switch position

Specified Condition

Relay terminal 3 - Body ground

Ignition Switch in OFF position

11 à 14 V

Relay terminal 1 - Body ground

Ignition Switch in OFF position

Below 1 V

Relay terminal 1 - Body ground

Ignition switch ON (IG)

11 à 14 V

Standard voltage:

PTC HTR No. 3

Tester Connection

Ignition switch position

Specified Condition

Relay terminal 3 - Body ground

Ignition Switch in OFF position

11 à 14 V

Relay terminal 1 - Body ground

Ignition Switch in OFF position

Below 1 V

Relay terminal 1 - Body ground

Ignition switch ON (IG)

11 à 14 V

*1

ENGINE ROOM RELAY BLOCK NO. 1

*2

ENGINE ROOM RELAY BLOCK NO. 2

*3

PTC HTR No. 1 RELAY

*4

PTC HTR No. 2 RELAY

*5

PTC HTR No. 3 RELAY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

OK
  1. INSPECT WIRE HARNESS AND CONNECTOR (PTC HEATER RELAY - AIR CONDITIONING AMPLIFIER ASSEMBLY)

(a) Disconnect connectors F138 and F139 from the air conditioning amplifier assembly.

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

PTC HTR No. 1

Tester Connection

Condition

Specified Condition

Relay terminal 2 - F139-18 (PTC1)

Always

Below 1 Ω

Relay terminal 2 or F139-18 (PTC1) - Body ground

Always

10 kΩ minimum

Standard resistance:

PTC HTR No. 2

Tester Connection

Condition

Specified Condition

Relay terminal 2 - F138-10 (PTC2)

Always

Below 1 Ω

Relay terminal 2 or F138-10 (PTC2) - Body ground

Always

10 kΩ minimum

Standard resistance:

PTC HTR No. 3

Tester Connection

Condition

Specified Condition

Relay terminal 2 - F138-11 (PTC3)

Always

Below 1 Ω

Relay terminal 2 or F138-11 (PTC3) - Body ground

Always

10 kΩ minimum

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

OK
  1. INSPECT WIRE HARNESS AND CONNECTOR (PTC HEATER RELAY - QUICK HEATER ASSEMBLY AND BODY GROUND)

(a) Disconnect connectors H1 and H3 from the quick heater assembly.

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

PTC HTR No. 1

Tester Connection

Condition

Specified Condition

Relay terminal 5 - H1-3 (B)

Always

Below 1 Ω

H1-2 (E) - Body ground

Always

Below 1 Ω

H3-1 (E) - Body ground

Always

Below 1 Ω

H1-3 (B) - Body ground

Always

10 kΩ minimum

Standard resistance:

PTC HTR No. 2

Tester Connection

Condition

Specified Condition

Relay terminal 5 - H1-1 (B)

Always

Below 1 Ω

H1-2 (E) - Body ground

Always

Below 1 Ω

H1-1 (B) - Body ground

Always

10 kΩ minimum

Standard resistance:

PTC HTR No. 3

Tester Connection

Condition

Specified Condition

Relay terminal 5 - H3-2 (B)

Always

Below 1 Ω

H3-1 (E) - Body ground

Always

Below 1 Ω

H3-2 (B) - Body ground

Always

10 kΩ minimum

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

OK
  1. INSPECT QUICK HEATER ASSEMBLY

(a) Remove the quick heater assembly.

Click here

(b) Inspect the quick heater assembly.

Click here

OK

REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY

NG

REPLACE QUICK HEATER ASSEMBLY