Removal and Installation - Front Timing Chain Case ++
Exploded View

| 1. | Engine assembly | 2. | Front timing chain case oil filter | 3. | Crankshaft pulley |
| 4. | Front oil seal | 5. | Front timing chain case | 6. | O-ring |
| A. | To valve timing control cover (bank 1/bank 2). Refer to Exploded View. | B. | Refer to Removal and Installation. | Front |
Removal and Installation
Remove and secure engine assembly to stand. Refer to Setting.
If removing the timing chains, obtain compression TDC of No. 1 cylinder as follows:Disconnect the vacuum hose from intake manifold collector. Refer to Exploded View. Disconnect the engine mount insulator (front) vacuum hose. Refer to Exploded View. Disconnect VIAS control solenoid valve harness connectors. Refer to Component Parts Location. Disconnect the harness connector from the electronic controlled engine mount control solenoid valve. Remove the electronic controlled engine mount control solenoid valve. Refer to Component Parts Location. Remove the EVAP canister purge volume control solenoid valve hose. Refer to Exploded View. Disconnect the EVAP canister purge volume control solenoid valve harness connector. Refer to Exploded View. Disconnect electronic throttle control actuator harness connector. Refer to Exploded View. Disconnect PCV hose from intake manifold collector. Loosen the intake manifold collector bolts and nuts in reverse of the sequence shown and then remove the intake manifold collector and intake manifold collector gasket.


| : Engine front |


Rocker cover (bank 2)

Rocker cover (bank 1)


: Engine front


| : Engine front |
If not, turn the crankshaft one revolution (360°) and align as shown.
While securely holding the hexagonal part in pulley center of drive belt auto-tensioner, move in the direction of arrow (loosening direction of drive belt auto-tensioner) using suitable tool.

Insert a rod approximately 6 mm (0.24 in) in diameter through the rear of drive belt auto-tensioner into retaining boss to lock drive belt auto-tensioner pulley.
Remove drive belt from crankshaft pulley and then remove it from the other pulleys.
Disconnect the harness connectors from the compressor.
Remove the compressor. Refer to Exploded View.
Remove "B" terminal nut and disconnect "B" terminal harness.
Disconnect the harness connector from generator.
Remove the generator. Refer to Exploded View.
Remove the crankshaft pulley as follows:
Secure crankshaft pulley with a suitable tool.
Loosen crankshaft pulley bolt and locate bolt seating surface at 10 mm (0.39 in) from its original position.
Position a suitable tool at recess hole of crankshaft pulley to remove crankshaft pulley.

Disconnect the harness connector from the engine oil pressure sensor and engine oil temperature sensor.
Remove water pipe. Refer to Exploded View.
Disconnect the water hoses from the oil cooler.
Loosen the oil pan (lower) bolts in reverse of the sequence shown.

Remove the oil pan (lower).
After removing the bolts, separate the mating surface and remove the old liquid gasket using Tool (A).

Tap (B) the Tool to insert it.
In areas where the Tool is difficult to use, lightly tap (C) to slide it.
Tool number (A) : KV10111100 (NI-37228)
Remove the old sealant from the bolt holes and threads.
Disconnect the harness connector from the engine oil pressure control solenoid valve.
Remove bolts (B) and remove engine oil pressure control solenoid valve (2).

Remove bolt (A) and remove oil pump drive chain cover (1).
Rotate oil pump drive chain tensioner (1) counterclockwise with a suitable tool and remove oil pump drive chain (2) from oil pump gear.

Remove the oil pump bolts (A) in reverse of the sequence shown and remove (if necessary).


Remove the oil pan (upper) using the following procedure:Remove the oil pan (upper) bolts in reverse of the sequence shown.


Remove the O-ring from the bottom of the cylinder block and oil pump housing.
Remove front cover gasket and rear oil seal retainer gasket.
Remove the old sealant from the mating surfaces using a suitable tool (A).

Also remove the old sealant from mating surface of the cylinder block.
Remove the old sealant from the bolt holes and threads.
Remove engine mounting bracket (RH). Refer to Exploded View.
Disconnect the harness connectors from electric intake valve timing control actuator and the exhaust valve timing control solenoid valve. Refer to Exploded View.
Remove the intake valve timing control cover [bank 1 (A)] and intake valve timing control cover [bank 2 (B)].
Loosen the intake valve timing control cover [bank 1 (A)] and intake valve timing control cover [bank 2 (B)] bolts in the reverse order as shown.

Loosen the front timing chain case bolts in reverse of the sequence shown and remove bolts.

Insert the appropriate size suitable tool into the notch (A) at the top of the front timing chain case as shown.

Cut liquid gasket for removal using Tool.
Remove O-rings (1) from rear timing chain case.

| (A) | : Bank 1 |
| (B) | : Bank 2 |
Remove the front oil seal from the front timing chain case using a suitable tool.

Remove all old liquid gasket (A) from all the bolt holes (B) and bolts.

Use a suitable tool to remove all of the old liquid gasket from the front timing chain case and opposite mating surfaces.
Remove front timing chain case oil filters (if necessary).
Install front timing chain case oil filter (2) (if necessary).

Ensure oil filter mesh remains intact during insertion into the front timing chain case (1).
Ensure oil filter mesh does not protrude from front timing chain case (1).
| (A) | : 1.0 - 1.5 mm (0.039 - 0.059 in) |
Install the new front oil seal on the front timing chain case. Apply new engine oil to the oil seal edges.

| (A) | : Engine inside |
| (B) | : Oil seal lip |
| (C) | : Dust seal lip |
| (D) | : Engine outside |
Install new O-rings (1) on rear timing chain case.

| (A) | : Bank 1 |
| (B) | : Bank 2 |
Apply liquid gasket to front timing chain case as shown.

Use Genuine Silicone RTV Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
Before installation, wipe off the protruding liquid gasket.
(C): 2.6 - 3.6 mm (0.102 - 0.142 in) diameter.
Install the front timing chain case by aligning the dowel pin on the rear timing chain case with the dowel pin hole in front timing chain case.
Loosely install the front timing chain case bolts.

| Bolt position | Bolt diameter |
| 1, 2 | : 8 mm (0.31 in) |
| 3 – 22 | : 6 mm (0.24 in) |
Tighten the front timing chain case bolts to the specified torque in the sequence shown.
Retighten the front timing chain case bolts to the specified torque in the sequence shown
| Bolt position | Tightening specification |
| 1, 2 | : 28 N·m |
| 3 – 22 | : 12,7 N·m |
Install intake valve timing control cover (bank 1) and intake valve timing control cover (bank 2) using the following procedure:Install the O-rings to the front timing chain case.
Install the O-rings (1) to the valve timing control cover (bank 1). Apply a bead of liquid gasket (C) to the valve timing control cover [bank 1 (2)] as shown.
Use Genuine Silicone RTV Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
| (1) | : Front timing chain case |
| (A) | : 4.0 - 5.6 mm (0.157 - 0.220 in) |
| (B) | : 3.4 - 4.4 mm (0.134 - 0.173 in) |

Use Genuine Silicone RTV Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
| (1) | : Front timing chain case |
| (A) | : 4.0 - 5.6 mm (0.157 - 0.220 in) |
| (B) | : 3.4 - 4.4 mm (0.134 - 0.173 in) |

| Bolts | : 11,3 N·m |
| (B) | : Bank 2 |
Install and tighten the electric intake valve timing control actuator to the specified torque.
| Electric intake valve timing control actuator bolts | : 9 N·m |
Apply sealant (A) to the front cover gasket and the rear oil seal retainer gasket as shown.

Use Genuine RTV Silicone Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
| Dimension (B) | : 15 mm (0.59 in) |
| Dimension (C) | : 5 mm (0.20 in) |
Install the front cover gasket (1) and rear oil seal retainer gasket (2) as shown.

| : Engine front |
Apply a bead of sealant to the cylinder block mating surface of the oil pan (upper) as shown.

Use Genuine RTV Silicone Sealant, or equivalent. Refer to Recommended Chemical Products and Sealants.
| : Engine front |
Install new O-ring (1) into the cylinder block before installing oil pan (upper).

- : Crankshaft pulley
Install the oil pan (upper).

Tighten bolts (1) and (2) to specification within five minutes of applying the liquid gasket.
Tighten the remaining oil pan (upper) bolts to specification in the sequence shown.
| Oil pan (upper) bolts | : 22 N·m |
Install the oil pump and new O-rings (1) and tighten oil pump bolts (A) to the specified torque in the sequence shown (if removed).

| Oil pump bolts | : 22 N·m |
Apply a continuous bead of sealant to the oil pan (lower).

Be sure the sealant is 4.5 - 5.5 mm (0.177 - 0.217 in) wide.
Use Genuine Silicone RTV Sealant, or equivalent. Refer to Recommended Chemical Products and Sealants.
| (A) | : Groove |
| (B) | : Bolt hole |
| : Inside |
Install the oil pan (lower) and tighten the oil pan (lower) bolts to the specified torque in the sequence shown.

| Oil pan (lower) bolts | : 8,8 N·m |
Install crankshaft pulley and tighten the bolt using the following procedure:
Lubricate thread and seat surface of the bolt with new engine oil.
Secure the crankshaft pulley using a suitable tool.
For the second step, angle tighten using Tool.
| Step 1 | : 90 N·m |
| Step 2 | : 90° - 96° clockwise |
| Tool number | : KV10112100 (BT-8653-A) |
Install components removed to obtain compression TDC of No.1 cylinder using the following procedure:Install rocker cover (bank 1) using the following procedure:
Apply a 3 mm (0.12 mm) bead of sealant to the areas on the front corners using a suitable tool.

Use Genuine Silicone RTV Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
(1) : Camshaft bracket (2) : Cylinder head (A) : 4 mm (0.16 in) (B) : 5 mm (0.20 in) (C) : 4 mm (0.16 in) (E) : 10 mm (0.39 in) Tighten the rocker cover bolts to the specified torque in the sequence shown.

Rocker cover bolts Step 1 : 2 N·m Step 2 : 8,3 N·m 
: Engine front
Apply a 3 mm (0.12 mm) bead of sealant to the areas on the front corners using a suitable tool.

Use Genuine Silicone RTV Sealant or equivalent. Refer to Recommended Chemical Products and Sealants.
(1) : Camshaft bracket (2) : Cylinder head (A) : 4 mm (0.16 in) (B) : 5 mm (0.20 in) (C) : 4 mm (0.16 in) (E) : 10 mm (0.39 in) Tighten the rocker cover bolts to the specified torque in the sequence shown.

Rocker cover bolts Step 1 : 2 N·m Step 2 : 8,3 N·m
Tighten bolts one revolution while alternating sides until high pressure fuel pump is mated to No. 1 camshaft bracket.
Tighten bolts to the specified torque.
High pressure fuel pump bolts : 26 N·m
Install high pressure fuel tube [pump side (2)] and hand tighten flare nut (A) and flare nut (C) until contact seat.

(1) : High pressure fuel tube (bank side) (D) : High pressure fuel tube (bank side) flare nut (E) : High pressure fuel tube (bank side) flare nut Hand tighten bolt (B).
Tighten flare nut (C) and then flare nut (A) to the specified torque.
Flare nut : 15 N·m Tighten flare nut (C) and then flare nut (A) to the specified torque.
Flare nut : 23 N·m Tighten bolt (B) to the specified torque.
Bolt : 13,5 N·m 
| (A) | : Clip |

| High pressure fuel pump cover bolts | : 11 N·m |
| : Engine front |

| Step 1 | : 7,4 N·m |
| Step 2 | : 26 N·m |
| : Engine front |

| Intake manifold collector nuts and bolts | : 11 N·m |

Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns smoothly.
Installation of the remaining components is in the reverse order of removal.
Perform the ″Throttle Valve Closed Position Learning″ when harness connector of the electric throttle control actuator is disconnected. Refer to Description.
Perform the ″Idle Air Volume Learning″ when the electric throttle control actuator is replaced. Refer to Description.
INSPECTION AFTER INSTALLATION
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required quantity, fill to the specified level. Refer to Fluids and Lubricants (FOR USA AND CANADA) or Fluids and Lubricants (FOR MEXICO).
Use procedure below to check for fuel leakage.
Place ignition switch in the "ON" position (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leakage at connection points.
Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gas, or any oils/fluids including engine oil and engine coolant.
Bleed air from passages in lines and hoses, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to specified level, if necessary.
Summary of the inspection items:
Item Before starting engine Engine running After engine stopped Engine coolant Level Leakage Level Engine oil Level Leakage Level Transmission/transaxle fluid A/T and CVT Models Leakage Level/Leakage Leakage M/T Models Level/Leakage Leakage Level/Leakage Other oils and fluids* Level Leakage Level Fuel Leakage Leakage Leakage Exhaust gas — Leakage — *Power steering fluid, brake fluid, etc.