Since hybrid vehicles and electric vehicles contain a high voltage battery, there is the risk of electric shock, electric leakage, or similar accidents if the high voltage component and Nissan Ariya vehicle are handled incorrectly. Be sure to follow the correct work procedures when performing inspection and maintenance.
REMOVAL
Follow the instructions below before starting the procedure.
Use a refrigerant collecting equipment (for HFO-1234yf) to discharge the refrigerant. Refer to Recycle Refrigerant.
Remove low-pressure refrigerator pipe assembly. Refer to Removal & Installation.
Remove high-pressure flexible hose. Refer to Removal & Installation.
Remove high-pressure cooler pipe assembly. Refer to Removal & Installation.
Remove A/C unit assembly top cover. Refer to Removal & Installation.
Disconnect sub harness connector and .
Remove mounting nuts , and then remove sub harness from sub harness bracket.
Remove mounting bolts , and then remove PTC cover.
Disconnect high voltage harness connector .
Remove left harness terminal mounting nut of A/C unit assembly cover.
Disconnect sub harness connector and .
Disengage harness fixing clip .
Remove right harness terminal mounting nut of A/C unit assembly cover.
Remove upper mounting bolts of A/C unit assembly cover.
Since it interferes surrounding , and part when removing A/C unit assembly cover, move or remove following parts to secure the work space.
Disconnect harness connectors and .
Move harness bracket .
Remove harness fix part from harness bracket.
Move water hoses .
Move water hose .
Remove bracket of charge port high voltage harness. Refer to CHARGE PORT : Removal & Installation.
Remove mounting nuts of A/C unit assembly cover.
Rotate the bottom to remove after pull out the air conditioner unit assembly in order of arrow 1→2 in the figure.
INSTALLATION
Note the following items, and then install in the reverse order of removal.
A/c Unit Assembly Top Cover Nissan Ariya 1st generation
Removal & Installation
DANGER:
Since hybrid vehicles and electric vehicles contain a high voltage battery, there is the risk of electric shock, electric leakage, or similar accidents if the high voltage component and Nissan Ariya vehicle are handled incorrectly. Be sure to follow the correct work procedures when performing inspection and maintenance.
REMOVAL
Remove cowl top cover. Refer to Removal & Installation.
Remove A/C unit assembly cover mounting bolts .
Remove cowl top extension. Refer to Removal & Installation.
Disengage high voltage harness fixing clips ,
Remove A/C unit assembly top cover mounting bolts .
Pull out the air conditioner unit assembly top cover in the order of 1→2 in the figure and remove it upward.
INSTALLATION
Note the following items, and then install in the reverse order of removal.