Preparation. Vehicle Charging System
Commercial Service Tools
| Tool name | Description | |
|---|---|---|
| Insulated gloves | ![]() |
Removing and installing high voltage components Comply with EN60903:
|
| Leather gloves | ![]() |
|
| Anti-static gloves | ![]() |
|
| Insulated safety shoes | ![]() |
Removing and installing high voltage components Comply with EN60903:
|
| Face shield | ![]() |
|
| Safety glasses | ![]() |
|
| Insulated helmet | ![]() |
Removing and installing high voltage components |
| Tube presser [Gasket material applicator] | ![]() |
Installing PDM (Power Delivery Module) cover (Apply the liquid gasket) |
Insulation resistance tester (Multi tester) |
![]() |
Measuring insulation resistance, voltage, and resistance |







