Component Parts /circuit Diagnosis
- Power Supply and Ground Circuit (electric Shift Control Module)
- Electric Shift Warning Lamp
- Selector Indicator
- Motor Coil
- Parking Actuator Relay
Power Supply and Ground Circuit (electric Shift Control Module) Nissan Ariya 2023
Diagnosis Procedure
CHECK 12V BATTERY
Check 12V battery. Refer to Work Flow.
Is the inspection result normal?
YES>>GO TO 2.
NO>>Repair or replace the error-detected parts.
CHECK BATTERY POWER SUPPLY CIRCUIT
Power switch OFF.
Disconnect electric shift control module harness connector.
Check the voltage between electric shift control module harness connector and ground.
+ - Condition Voltage Electric shift control module Connector Terminal M202 8 Ground Power switch: ON or ACC 9 – 16 V Power switch: OFF Approx. 0 V M203 42 Power switch: ON or ACC 9 – 16 V Power switch: OFF Approx. 0 V
Is the inspection result normal?
YES>>GO TO 3.
NO>>GO TO 4.
CHECK POWER ON SIGNAL CIRCUIT
Power switch OFF.
Check the voltage between electric shift control module harness connector and ground.
+ - Condition Voltage Electric shift control module Connector Terminal M202 9 Ground Power switch: ON 9 – 16 V Power switch: OFF Approx. 0 V
Is the inspection result normal?
YES>>GO TO 6.
NO>>GO TO 5.
DETECT MALFUNCTIONING ITEMS (FOR BATTERY POWER SUPPLY)
Check the following items:
Harness for short or open between electric shift control module harness connector terminal 8 and fuse block (J/B) harness connector terminal 95
Harness for short or open between electric shift control module harness connector terminal 42 and fuse block (J/B) harness connector terminal 132
10A fuse (#49)
10A fuse (#52)
Is the inspection result normal?
YES>>Perform inspection of accessory power supply circuit. Refer to Wiring Diagram.
NO>>Repair or replace the error-detected parts.
DETECT MALFUNCTIONING ITEMS (FOR POWER ON SIGNAL)
Check the following items:
Harness for short or open between electric shift control module harness connector terminal 9 and fuse block (J/B) harness connector terminal 91
10A fuse (#3)
Is the inspection result normal?
YES>>Perform inspection of ON power supply circuit. Refer to Wiring Diagram.
NO>>Repair or replace the error-detected parts.
CHECK ELECTRIC SHIFT CONTROL MODULE GROUND CIRCUIT
Power switch OFF.
Check continuity between electric shift control module harness connector and ground.
Electric shift control module ― Continuity Connector Terminal M202 3 Ground Existed 4 6 M203 25
Is the inspection result normal?
YES>>INSPECTION END
NO>>Repair or replace the error-detected parts.
Electric Shift Warning Lamp Nissan Ariya SUV
Component Function Check
OPERATION INSPECTION OF ELECTRIC SHIFT WARNING LAMP
Check that the electric shift warning lamp in combination meter turns ON for approx. 2 seconds after power switch ON.
Is the inspection result normal?
YES>>INSPECTION END
NO>>Refer to Diagnosis Procedure.
Diagnosis Procedure
PERFORM SELF-DIAGNOSIS (FOR ELECTRIC SHIFT CONTROL MODULE)
With CONSULT
Power switch to ON.
Perform self-diagnosis for “SHIFT”.
Is any DTC detected?
YES>>Perform trouble diagnosis for detected DTC. Refer to DTC Index.
NO>>GO TO 2.
PERFORM SELF-DIAGNOSIS (FOR VCM)
With CONSULT
Power switch to ON.
Perform self-diagnosis for “EV/HEV”.
Is any DTC detected?
YES>>Perform trouble diagnosis for detected DTC. Refer to DTC Index.
NO>>Check input/output signals of VCM. Refer to Physical Values.
If the inspection result is normal, GO TO 3.
PERFORM SELF-DIAGNOSIS (FOR COMBINATION METER)
With CONSULT
Power switch to ON.
Perform self-diagnosis for “COMBINATION METER”.
Is any DTC detected?
YES>>Perform trouble diagnosis for detected DTC. Refer to DTC Index.
NO>>Perform the trouble diagnosis for combination meter. Refer to On Board Diagnosis Function.
Selector Indicator Nissan Ariya first Gen
Component Function Check
OPERATION INSPECTION OF SELECTOR INDICATOR
Set the Nissan Ariya vehicle to READY.
Operate the selector lever.
Check that the selected shift position and the indication position of the selector indicator match.
Is the inspection result normal?
YES>>GO TO 2.
NO>>Refer to Diagnosis Procedure.
INSPECTION OF THE SELECTOR INDICATOR ILLUMINATION
Turn the headlamp ON.
Check that the selector indicator illumination up.
Is the inspection result normal?
YES>>INSPECTION END
NO>>Refer to Wiring Diagram. of the illumination.
Diagnosis Procedure
INSPECTION OF SELECTOR INDICATOR POWER SOURCE CIRCUIT
Power switch to OFF.
Disconnect the electric shift selector harness connector.
Power switch to ACC or ON.
Check the voltage between electric shift selector harness connector and ground.
+ - Voltage Electric shift selector Connector Terminal M200 9 Ground 9 – 16 V
Is the inspection result normal?
YES>>GO TO 4.
NO>>GO TO 2.
INSPECTION OF SELECTOR INDICATOR POWER SOURCE CIRCUIT
Power switch to OFF.
Disconnect fuse block (J/B) harness connector.
Check the continuity between electric shift selector harness connector and fuse block (J/B) harness connector.
Electric shift selector Fuse block (J/B) Continuity Connector Terminal Connector Terminal M200 9 M74 95 Existed Check the continuity between electric shift selector harness connector and ground.
Electric shift selector ― Continuity Connector Terminal M200 9 Ground Not existed
Is the inspection result normal?
YES>>GO TO 3.
NO>>Repair or replace the error-detected parts.
DETECT MALFUNCTIONING ITEM
Check the following items:
10A fuse (#52)
Perform inspection of ON power supply circuit and accessory power supply circuit. Refer to Wiring Diagram.
Repair or replace the error-detected parts.
INSPECTION OF THE CIRCUIT BETWEEN ELECTRIC SHIFT CONTROL MODULE AND ELECTRIC SHIFT SELECTOR
Power switch to OFF.
Disconnect electric shift control module harness connector.
Check the continuity between electric shift control module harness connector and electric shift selector harness connector.
Electric shift control module Electric shift selector Continuity Connector Terminal Connector Terminal M202 22 M200 22 Existed M203 26 23 30 21 38 20 Check the continuity between electric shift control module harness connector and ground.
Electric shift control module ― Continuity Connector Terminal M202 22 Ground Not existed M203 26 30 38
Is the inspection result normal?
YES>>GO TO 5.
NO>>Repair or replace the error-detected parts.
CHECK GROUND CIRCUIT
Check continuity between electric shift selector harness connector and ground.
| Electric shift selector | ― | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| M200 | 11 | Ground | Existed |
Is the inspection result normal?
YES>>Replace the electric shift selector. Refer to ELECTRIC SHIFT SELECTOR : Removal & Installation.
NO>>Repair or replace the error-detected parts.
Motor Coil Nissan Ariya 2023
Component Inspection
INSPECTION OF MOTOR COIL (IN PARKING ACTUATOR)
Power switch OFF.
Disconnect the parking actuator harness connector.
Check the resistance between parking actuator connector terminals.
Parking actuator Resistance Terminal 2 1 0 °C: 1.06 – 1.29 Ω
40 °C: 1.24 – 1.51 Ω6 7
Is the inspection result normal?
YES>>INSPECTION END
NO>>Replace the reduction gear assembly due to the malfunction of motor coil (in parking actuator). Refer to REDUCTION GEAR : Unit Removal & Installation.
Parking Actuator Relay Nissan Ariya
Component Inspection
CHECK CIRCUIT OF PARKING ACTUATOR RELAY
Power switch OFF.
Remove the parking actuator relay. Refer to Component Parts Location.
Check the continuity between parking actuator relay terminals.
Parking actuator relay Continuity Terminal 1 2 Existed 1 3 Not existed 2 5 Not existed
Is the inspection result normal?
YES>>GO TO 2.
NO>>Replace parking actuator relay.
CHECK OPERATION OF PARKING ACTUATOR RELAY
Check for continuity between the parking actuator relay terminals under the following conditions.
| Parking actuator relay | Condition | Continuity | |
|---|---|---|---|
| Terminal | |||
| 3 | 5 | Approximately 12 V voltage was applied between terminals 1 - 2 of the parking actuator relay. | Existed |
| Voltage is not applied between terminals 1 - 2 of the parking actuator relay. | Not existed | ||
Is the inspection result normal?
YES>>INSPECTION END
NO>>Replace parking actuator relay.