Electric Expansion Valve (heating)
Removal
REMOVAL
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during No. 2 cooler expansion valve removal/installation are shown below.
Necessary Procedures After Parts Removed/Installed/ReplacedReplaced Part or Performed Procedure | Necessary Procedures | Effect/Inoperative Function When Necessary Procedures are not Performed | Link |
|---|---|---|---|
| *: Even when not replacing the part, it is necessary to perform the specified necessary procedures after installation. | |||
Front bumper assembly* |
Front television camera view adjustment |
Panoramic View Monitor System |
|
Advanced Park |
|||
Heating electric expansion valve (magnet valve assembly) |
|
DTCs are stored |
|

Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
ACCUMULATOR ASSEMBLY |
88470H |
- |
- |
- |
2 |
MAGNET VALVE ASSEMBLY |
88690K |
- |
- |
|
*1 |
NO. 3 LIQUID TUBE |
- |
- |
● |
Non-reusable part |
- |
- |
PROCEDURE
1. REMOVE ACCUMULATOR ASSEMBLY
Click here ![]()
2. REMOVE MAGNET VALVE ASSEMBLY

(1) Remove the 2 bolts and No. 3 liquid tube.
(2) Remove the 2 O-rings from the No. 3 liquid tube.
NOTICE:
Seal the openings of the removed parts using vinyl tape to prevent moisture and foreign matter from entering them.

(1) Remove the 2 bolts and magnet valve assembly.
Installation
INSTALLATION
COMPONENTS (INSTALLATION)
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
MAGNET VALVE ASSEMBLY |
88690K |
- |
- |
|
2 |
ACCUMULATOR ASSEMBLY |
88470H |
- |
- |
- |
3 |
INITIALIZATION MAGNET VALVE ASSEMBLY |
88690K |
- |
- |
|
*1 |
NO. 3 LIQUID TUBE |
- |
- |
![]() |
N*m (kgf*cm, ft.*lbf): Specified torque |
● |
Non-reusable part |
![]() |
Compressor oil ND-OIL 11 or equivalent |
- |
- |
PROCEDURE
1. INSTALL MAGNET VALVE ASSEMBLY

(1) Install the magnet valve assembly with the 2 bolts.
Torque:
9,8 N·m {100 kgf·cm, 87 in·lbf}

(1) Remove the vinyl tape, and sufficiently apply compressor oil to 2 new O-rings and the fitting surface of the No. 3 liquid tube.
Compressor Oil:
ND-OIL 11 or equivalent
(2) Install the 2 O-rings to the No. 3 liquid tube.
NOTICE:
Keep the O-ring and O-ring fitting surface free of foreign matter.
(3) Install the No. 3 liquid tube with the 2 bolts.
Torque:
9,8 N·m {100 kgf·cm, 87 in·lbf}
2. INSTALL ACCUMULATOR ASSEMBLY
Click here ![]()
3. INITIALIZATION MAGNET VALVE ASSEMBLY
Click here ![]()













