Fuel Lid Opener Switch
- Removal
- Inspection
- Installation
Removal
REMOVAL
COMPONENTS (REMOVAL)
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
FRONT DOOR SCUFF PLATE LH |
67914 |
- |
- |
- |
2 |
COWL SIDE TRIM BOARD LH |
62112 |
- |
- |
- |
3 |
NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY |
55606 |
- |
- |
- |
4 |
LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY |
55480D |
- |
- |
- |
5 |
FUEL LID OPENER SWITCH |
84841A |
- |
- |
- |
*A |
w/o Knee Airbag |
*B |
w/ Knee Airbag |
PROCEDURE
1. REMOVE FRONT DOOR SCUFF PLATE LH
Click here
![]()
2. REMOVE COWL SIDE TRIM BOARD LH
Click here
![]()
3. REMOVE NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
![]()
4. REMOVE LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY
Click here
![]()
5. REMOVE FUEL LID OPENER SWITCH

![]() |
Remove in this Direction |
- |
- |
Inspection
INSPECTION
PROCEDURE
1. INSPECT FUEL LID OPENER SWITCH
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the fuel lid opener switch. |
|
(b) Check that the switch illuminates.
(1) Apply auxiliary battery voltage to the fuel lid opener switch and check that the switch illuminates.
OK:
Tester Connection | Condition | Specified Condition |
|---|---|---|
Auxiliary battery positive ( ) → K50-6 (ILL ) Auxiliary battery negative (-) → K50-1 (ILL-) |
Always |
Switch illumination illuminates |
If the result is not as specified, replace the fuel lid opener switch.
Installation
INSTALLATION
COMPONENTS (INSTALLATION)
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
FUEL LID OPENER SWITCH |
84841A |
- |
- |
- |
2 |
LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY |
55480D |
- |
- |
- |
3 |
NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY |
55606 |
- |
- |
- |
4 |
COWL SIDE TRIM BOARD LH |
62112 |
- |
- |
- |
5 |
FRONT DOOR SCUFF PLATE LH |
67914 |
- |
- |
- |
*A |
w/o Knee Airbag |
*B |
w/ Knee Airbag |
![]() |
N*m (kgf*cm, ft.*lbf): Specified torque |
- |
- |
PROCEDURE
1. INSTALL FUEL LID OPENER SWITCH
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY
Click here ![]()
3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
4. INSTALL COWL SIDE TRIM BOARD LH
5. INSTALL FRONT DOOR SCUFF PLATE LH








