Heater Relay (for Phev Model)
- Removal
- Inspection
- Installation
Removal
REMOVAL
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during No. 1 traction battery heater relay removal/installation are shown below.
CAUTION:
- Orange wire harnesses and connectors indicate high-voltage circuits. To prevent electric shock, always follow the procedure described in the repair manual.

Click here

- To prevent electric shock, wear insulated gloves when working on wire harnesses and components of the high voltage system.

NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal.
Click here ![]()
HINT:
When the cable is disconnected / reconnected to the auxiliary battery terminal, systems temporarily stop operating. However, each system has a function that completes learning the first time the system is used.
Items for which learning is completed by driving the Toyota Prius vehicleEffect/Inoperative Function when Necessary Procedure not Performed | Necessary Procedure | Link |
|---|---|---|
Front Camera System |
Drive the Toyota Prius vehicle straight ahead at 35 km/h or more for 5 seconds or more. |
Effect/Inoperative Function when Necessary Procedure not Performed | Necessary Procedure | Link |
|---|---|---|
| *1: w/o Power Back Door System *2: w/ Power Back Door System |
||
Power Door Lock Control System*1
|
Perform door unlock operation with door control switch or electrical key transmitter sub-assembly switch. |
|
Power Back Door System*2 |
Reset back door close position |
|
Air Conditioning System |
After the ignition switch is turned to ON, the servo motor and expansion valve standard position is recognized. |
- |

Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
HV SUPPLY BATTERY ASSEMBLY |
G9510 |
- |
- |
- |
2 |
NO. 1 TRACTION BATTERY COVER |
- |
- |
- |
|
3 |
NO. 1 TRACTION BATTERY HEATER RELAY |
G96J1 |
- |
- |
|
*1 |
NO. 1 HV BATTERY SEAL |
- |
- |
● |
Non-reusable part |
- |
- |
PROCEDURE
1. REMOVE HV SUPPLY BATTERY ASSEMBLY
Click here ![]()
2. REMOVE NO. 1 TRACTION BATTERY COVER
![]() |
Click here |
3. REMOVE NO. 1 TRACTION BATTERY HEATER RELAY
![]() |
CAUTION: Be sure to wear insulated gloves and protective goggles. |

Inspection
INSPECTION
PROCEDURE
1. INSPECT NO. 1 TRACTION BATTERY HEATER RELAY
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the No. 1 traction battery heater relay. |
|
Installation
INSTALLATION
COMPONENTS (INSTALLATION)
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
NO. 1 TRACTION BATTERY HEATER RELAY |
G96J1 |
- |
- |
|
2 |
NO. 1 TRACTION BATTERY COVER |
- |
- |
- |
|
3 |
CHECK FOR AIRTIGHTNESS |
- |
- |
- |
|
4 |
HV SUPPLY BATTERY ASSEMBLY |
G9510 |
- |
- |
- |
*1 |
NO. 1 HV BATTERY SEAL |
- |
- |
![]() |
N*m (kgf*cm, ft.*lbf): Specified torque |
● |
Non-reusable part |
PROCEDURE
1. INSTALL NO. 1 TRACTION BATTERY HEATER RELAY
![]() |
CAUTION: Be sure to wear insulated gloves and protective goggles. |
Torque:
7,5 N·m {76 kgf·cm, 66 in·lbf}
2. INSTALL NO. 1 TRACTION BATTERY COVER
![]() |
Click here |
3. CHECK FOR AIRTIGHTNESS (COMPONENT)
Click here ![]()
4. INSTALL HV SUPPLY BATTERY ASSEMBLY
Click here ![]()