A/C On signal
Component Function Check
1.CHECK A/C ON SIGNAL
With CONSULT
- Turn ignition switch ON.
- Operate front blower motor.
- Select "AIR CONDITIONER" of "BCM" using CONSULT.
- Select "AIR COND SW" in "DATA MONITOR" mode, and check status under the following condition.

Is the inspection result normal?
YES >> Inspection End.
NO >> Refer to HAC "Diagnosis Procedure".
Diagnosis Procedure
Regarding Wiring Diagram information, refer to HAC "Wiring Diagram".
1.CHECK FUSE
- Turn ignition switch OFF.
- Check 10A fuse (No. 21, located in fuse block (J/B)].
NOTE: Refer to PG "Terminal Arrangement".
Is the inspection result normal?
YES >> GO TO 2.
NO >> Replace the blown fuse after repairing the affected circuit.
2.CHECK THERMO CONTROL AMP. POWER SUPPLY
- Turn ignition switch OFF.
- Disconnect thermo control amp. connector.
- Turn ignition switch ON.
- Check voltage between thermo control amp. harness connector and ground.

Is the inspection result normal?
YES >> GO TO 3.
NO >> Repair harness or connector between thermo control amp. and fuse.
3.CHECK THERMO CONTROL AMP. GROUND CIRCUIT FOR OPEN
- Turn ignition switch OFF.
- Check continuity between thermo control amp. harness connector and ground

Is the inspection result normal?
YES >> GO TO 4.
NO >> Repair harness or connector.
4.CHECK A/C ON SIGNAL
- Turn ignition switch ON.
- Check output waveform between thermo control amp. harness connector and ground with using oscilloscope.

Is the inspection result normal?
YES >> GO TO 5.
NO >> GO TO 6.
5.CHECK FRONT AIR CONTROL
- Turn ignition switch OFF.
- Check front air control. Refer to HAC "Component Inspection".
Is the inspection result normal?
YES >> Replace thermo control amp. Refer to HAC "Removal and Installation".
NO >> Replace front air control. Refer to HAC "Removal and Installation".
6.CHECK A/C ON SIGNAL CIRCUIT FOR OPEN
- Turn ignition switch OFF.
- Disconnect BCM and front air control connector.
- Check continuity between thermo control amp. harness connector and BCM harness connector.

- Check continuity between front air control harness connector and BCM harness connector.

Is the inspection result normal?
YES >> Replace BCM. Refer to BCS "Removal and Installation" or BCS "Removal and Installation".
NO >> Repair harness or connector.
Component Inspection
1.CHECK A/C CONTROL
Check continuity front air control terminals. 
Is the inspection result normal?
YES >> Inspection End.
NO >> Replace front air control. Refer to HAC "Removal and Installation".