Snow Switch Test
In this manual: Snow Switch Test
~1min read
Removal/Installation
1. Center Console Panel - Remove
2. Snow Switch - Test
6-speed A/T

- Check for continuity between the terminals in each switch position according to the table.
NOTE:
- Make sure the correct test lead (+ or -) is placed on the terminal.
- When checking for continuity across the diode, use the diode setting (
) on the digital volt/ohm meter to check the diode bias. - Note this important operating characteristic; diode bias causes a diode to fully conduct electricity in one direction (forward), while not at all in the opposite direction (reverse).
- If the continuity is not as specified, replace the snow switch (A).
9-speed A/T


3. All Removed Parts - Install
- Install the parts in the reverse order of removal.
Was this page helpful?